Name of ship as recorded on the record

Ship name

Granatiere Padula ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Werribee ( Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909 )

Hua Shan ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/10/1908 ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

142 ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

undefined ( Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The name of the port/place of destination given.

The year in which a vessel’s construction is completed.

Year of ship completion

1909 ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Blyth Shipbuilding & Dry Docks Co Ltd ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Blyth ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Screw Steamer ( Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Longitudinal Section Plan for Granatiere Padula, 28th November 1907 1907, Midship Section Plan for Granatiere Padula, 28th November 1907 1907, Plan of Single Plate Rudder for Granatiere Padula, 14th January 1908 1908, Memo for Werribee, 14th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Werribee, 14th December 1908 1908, Report on Machinery for Werribee, 9th December 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hua Shan, 14th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 18th January 1909 1909, Steel Steamer Report for Werribee, 13th January 1909 1909, Letter from G A Dryden Toyne, to The Secretary, regarding Werribee, 12th January 1909 1909, Report on Electric Lighting Installation for Werribee, 16th January 1909 1909, Report of Surveys for Freeboard-Steam Ships for Granatiere Padula, 30th May 1933 1933, Report of Surveys for Freeboard for Hua Shan, 30th May 1933 1933, Report of Survey for Repairs, &c for Granatiere Padula, 6th June 1940 1940, Copy of Certificate of Survey of Repairs for Granatiere Padula, 5th June 1940 1940, Copy of Certificate of Survey of Boilers for Granatiere Padula, 5th June 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Granatiere Padula, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Granatiere Padula, 6th June 1940 1940, Copy of memo regarding Italian Vessels Classed in Society\'s Register Book for Granatiere Padula, 1st August 1941 1941, Memo for Granatiere Padula, Undated no date, Form of Postponed Surveys for Granatiere Padula, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Direct Acting Triple Expansion ( Report on Machinery for Werribee, 9th December 1908 1908 )

Date in which construction of a vessel’s engines were completed.

Recorded information related to a vessel’s movements.

Voyage information

Blyth; Melbourne ( Steel Steamer Report for Werribee, 13th January 1909 1909 )

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.