Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
Liverpool ( Survey Report for Governor, 20th January 1840 1840, Annual Surveys Report for Governor, April 1843 1843 )
London ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Adamson ( Survey Report for Governor, 20th January 1840 1840 )
Lowther ( Annual Surveys Report for Governor, April 1843 1843 )
Location where a vessel’s survey was undertaken.
Liverpool ( Survey Report for Governor, 20th January 1840 1840 )
London ( Annual Surveys Report for Governor, April 1843 1843, Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Recorded information related to a vessel’s movements.
Liverpool; Lagueyra; Cape of Good Hope ( Survey Report for Governor, 20th January 1840 1840 )
London; St Vincents ( Annual Surveys Report for Governor, April 1843 1843 )
London; For Sale ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
148 ( Survey Report for Governor, 20th January 1840 1840 )
150 ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Governor, 20th January 1840 1840, Annual Surveys Report for Governor, April 1843 1843, Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv ( Survey Report for Governor, 20th January 1840 1840 )
Lon ( Annual Surveys Report for Governor, April 1843 1843, Report of Survey for Repairs for Governor, 4th June 1860 1860 )
The individual and/or organisation listed
Robert Russell & Sons; John Archer ( Survey Report for Governor, 20th January 1840 1840 )
Russell & Co ( Annual Surveys Report for Governor, April 1843 1843 )
Brenan ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Name of surveyor.
Jabez Bayley ( Survey Report for Governor, 20th January 1840 1840 )
Nathaniel Middleton ( Annual Surveys Report for Governor, April 1843 1843 )
William T Mumford ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 7 Years ( Survey Report for Governor, 20th January 1840 1840 )
7A1 ( Annual Surveys Report for Governor, April 1843 1843 )
AE1; record repairs ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
The name of the port/place of destination given.
Lagueyra; Cape of Good Hope ( Survey Report for Governor, 20th January 1840 1840 )
St Vincents ( Annual Surveys Report for Governor, April 1843 1843 )
For Sale ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
149 ( Survey Report for Governor, 20th January 1840 1840 )
148 ( Report of Survey for Repairs for Governor, 4th June 1860 1860 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
Have you noticed missing or incorrect data or images for this ship?