Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Glenarm ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, List of Proposed Equipment for Glenarm, undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

19/07/1890 ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

41 ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, List of Proposed Equipment for Glenarm, undated no date )

Glasgow ( Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894 )

Rouen ( Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936 )

Havre ( Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938 )

London ( Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938 )

London; Havre ( Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937 )

Antwerp ( Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, List of Proposed Equipment for Glenarm, undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner ( Steel Ship Report for Glenarm, 22nd July 1890 1890, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

The year in which a vessel’s construction is completed.

Year of ship completion

1890 ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

MacIlwaine & MacColl Ltd ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

undefined ( Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Main Steel Boiler for Glenarm, 9th November 1889 1889, Plan of Longitudinal Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd October 1889 1889, Plan of Midship Section for Glenarm, 23rd of October 1889 1889, Plan of donkey Boiler for Glenarm, 15th November 1889 1889, Letter from Surveyor James Turpin to the Secretary of Lloyd's Register, London, enclosing Midship Section of Glenarm, 9th July 1890 1890, Engine Forgings form For Glenarm, February 1890 1890, Ship Forgings Form for Glenarm, May 1890 1890, Particulars for Record of Double Bottoms &c for Glenarm, 22nd July 1890 1890, Particulars for Record of Material of Boilers Form for Glenarm, 23rd July 1890 1890, Particulars for Record of Moulded Depth for Glenarm, 22nd July 1890 1890, Memo regarding classification of Glenarm, 28th July 1890 1890, Letter from Surveyor James Maxton to the Secretary of Lloyd's Register, London, regarding shafting of Glenarm, 23rd July 1890 1890, Steel Ship Report for Glenarm, 22nd July 1890 1890, Report on Machinery for Glenarm, 16th July 1890 1890, Letter from Thomas W Douglas, to the Seceratary of Lloyd's Register, London, returning line plans for Glenarm 28th November 1894 1894, Plan of Longitudinal Elevation for Glenarm, 27th February 1894 1894, Memo from Chief Surveyor to the Classing Committee regarding classing of Glenarm, 9th July 1895 1895, Letter from Belfast Surveyor James Turpin to the Secretary, London, regarding retest of cellular double bottoms for Glenarm, 8th July 1895 1895, Memo from Chief Surveyor to the Classing Committee regarding the lengthening & repair of damage on Glenarm, 4th July 1895 1895, Letter from James Turpin to the Secretary, London, regarding the Lengthening of Glenarm, 12th March 1895 1895, Report of Survey for Repairs, &c for Glenarm, 1st July 1895 1895, Memo requesting a survey for damage sustained by Glenarm, 29th June 1895 1895, Plan of Longitudinal Elevation for Glenarm, 30th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glenarm, 5th June 1895 1895, Plan of Half Midship Section for Glenarm, 7th January 1896 1896, Correspondence from J MacGeachie, surveyor at Rouen, to the Secretary of Lloyd's Register regarding the grounding of Cantenac, 28 October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the survey of Cantenac, 23 October 1936 1936, Copy of document certifying the survey of Cantenac, 12 October 1936 1936, Copy of document certifying the class of Cantenac, 8 October 1936 1936, Report of Survey for repairs for Cantenac, 12 October 1936 1936, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the case of Cantenac, 9 October 1937 1937, Copy and free translation of letter sent from Worms & Cie to the Surveyors at Havre regarding the boiler survey of Cantenac, 8 October 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the case of Cantenac, 1 October 1937 1937, Postponed surveys form for Cantenac, 30 September 1937 1937, Correspondence question and answer between the Secretary of Lloyd's Register and the surveyors at Havre regarding the survey of Cantenac, 7 September 1937; 27 September 1937 1937, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac is laid up at Havre, 25 September 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 20 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 19 July 1937 1937, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the cases of Cantenac, Jumieges, and Normanville, 15 July 1937 1937, Copy and translations of letter from Worms & Cie to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 13 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 12 July 1937 1937, Copy of correspondence from the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Havre regarding the cases of Cantenac and Jumieges, 24 June 1937 1937, Report of total loss and casualty for Cantenac, 11 June 1938 1938, Correspondence from G A Laing, surveyor at Antwerp, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 9 June 1938 1938, Copy of correspondence form the Clerk to the Classification Committee of Lloyd's Register to the surveyors at Antwerp regarding the demolition of Cantenac, 3 June 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 2 June 1938 1938, Copy of document certifying the seaworthiness of Cantenac in order to be towed for demolition, 27 May 1938 1938, Correspondence from O J Trechmann, surveyor at Havre, to the Secretary of Lloyd's Register, regarding the breaking up of Cantenac, 21 May 1938 1938, Correspondence from Worms & Cie to the Surveyors at Havre informing that Cantenac was sold for breaking up purposes, 20 May 1938 1938, Copy of correspondence to the Secretary of Lloyd's Register regarding the case of Cantenac, 20 May 1938 1938, List of Proposed Equipment for Glenarm, undated no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date, Extract from memorandum received from the Havre Surveyors on the 20 May 1938 regarding Cantenac no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.