Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Glen Gelder ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Glengelder ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885 )

Glen-Gelder ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

304 ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Aberdeen ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Abn ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Gls ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889 )

Lon ( Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886 )

The individual and/or organisation listed

Ship owner

Connon & Fleming ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881 )

T Hemming ( Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883 )

Aberdeen Glen Line Steam Ship Co Ltd ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892 )

Glen Line Steam Ship Co ( Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886 )

Aberdeen GlenLine Steam Ship Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887 )

Aberdeen Glen Line S S Co Ltd ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897 )

Aberdeen ( Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889 )

Aberdeen Glen Lime S S Co Ltd ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

Aberdeen Glen Line Steam Shipping Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894 )

Aberdeen Glen Lime Steam Ship Co Ltd ( Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895 )

J Cook & Son ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Aberdeen Glen Line S S Co Ltd; J Cook & Sons ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896 )

Aberdeen Glen Line S S Co (Ltd) ( Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897 )

George Milne ( Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899 )

George Milne junior ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899 )

Name of surveyor.

Surveyor

Thomas W Kettle ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883 )

John Sturrock ( Report on Machinery for Glengelder, March 1881 1881 )

George Stanbury ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884 )

William J Darling ( Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885 )

Senhouse Martindale ( Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886 )

John Sanderson ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889 )

Herbert W Dove ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889 )

Maurice Ritson ( Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Recorded information related to a vessel’s movements.

Voyage information

Aberdeen; Baltic ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Aberdeen; Archangel ( Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883 )

Glasgow; Archangel ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884 )

Glasgow; Baltic; Troon ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889 )

Aberdeen; The Baltic ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

Aberdeen; Stettin ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892 )

Aberdeen; Grangemouth ( Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894 )

Aberdeen; Continent ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896 )

Aberdeen; Mediterranean ( Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897 )

Aberdeen; London ( Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound Inverted Cylinders Surface Condensing ( Report on Machinery for Glengelder, March 1881 1881 )

Compound ( Report on Machinery for Glen Gelder, 14th March 1899 1899 )

A vessel’s calculated maximum speed.

The year in which a vessel’s construction is completed.

Year of ship completion

1881 ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Alexander Hall & Co ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

The name of the yard where the vessel was built.

Yard name

Footdee ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Location where a vessel’s survey was undertaken.

Location of Survey

Aberdeen ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Glasgow ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887 )

London ( Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886 )

Ayr; Glasgow ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889 )

A vessel’s means of propulsion.

Propulsion

Steam ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Sail ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881 )

undefined ( Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Midship Section Plan for Glen Gelder, 22nd April 1880 1880, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Profile & Plan of Pumping Arrangement for Glen Gelder, 23rd February 1881 1881, Plan of Donkey Boiler & Steam Dome for Glen Gelder, 1881 1881, Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Plan of Boiler for Glen Gelder, 1898 1898, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

The listed port to which a given vessel belongs.

Port belonging to

Aberdeen ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

undefined ( Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

P Easson ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report on Machinery for Glengelder, March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884 )

J Munro ( Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886 )

H Allen ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889 )

A Spence ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

Gray ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892 )

A R Spence ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893 )

G W Keith ( Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895 )

A Gordon ( Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895 )

J Smart ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896 )

J R B Smart ( Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897 )

100A1; Record freeboard ( Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884 )

100A1; +LMC 7,80; S S No 1-85 ( Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885 )

+LMC 7,85 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885 )

+100A1 ( Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

+100A1 12,86; +LMC 7.85 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887 )

+100A1 5,88 ( Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889 )

+100A1; 5,88; S S 10,87; LMC 7,85 ( Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889 )

100 A1 ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

+100A1; +LMC 2,91; S S 2,92; S S Cff No3 - 2,91 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892 )

S S 5,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893 )

100A1; S S 5,94 ( Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894 )

S S 5,94 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894 )

100 A1; +LMC 7,95 ( Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895 )

+LMC 7,95 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895 )

S S 7,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896 )

100A1; S S 10,97 ( Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897 )

+100A1- 2,97; S S 10,97 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897 )

100A1; S S No2 - 99; +LMC 3,99; +NB 3,99 ( Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899 )

+LMC 3,99; +NB 3,99 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899 )

The name of the port/place of destination given.

Destined voyage

Baltic ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Archangel ( Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884 )

The Baltic ( Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

Stettin ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892 )

Grangemouth ( Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894 )

Not Fixed ( Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895 )

Continent ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896 )

Mediterranean ( Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897 )

London ( Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

790 ( Iron Ship Report for Glengelder, 26th March 1881 1881, Report of Survey for Repairs, &c for Glengelder, 27th June 1883 1883, Report of Survey for Repairs, &c for Glen Gelder, 15th August 1884 1884, Report of Survey for Repairs, &c for Glen Gelder, 23rd July 1885 1885, Report of Survey for Repairs, &c, of Engines & Boilers for Glengelder, 23rd July 1885 1885, Report of Survey for Repairs, &c; Damage Repairs for Glen Gelder, 29th January 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 1st September 1887 1887, Report of Survey for Repairs, &c for Glen Gelder, 25th May 1889 1889, Report of Survey for Repairs, &c of Engines & Boilers for Glen Gelder, 22nd May 1889 1889, Report of Survey for Repairs, &c for Glen-Gelder, 18th August 1891 1891 )

709 ( Report on Machinery for Glengelder, March 1881 1881 )

746 ( Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 30th July 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 7th June 1893 1893, Report of Survey for Repairs, &c for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 26th May 1894 1894, Report of Survey for Repairs, &c for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 31st July 1895 1895, Report of Survey for Repairs, &c for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c of Engine & Boilers for Glen Gelder, 27th December 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th July 1896 1896, Report of Survey for Repairs, &c for Glen Gelder, 24th February 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 29th October 1897 1897, Report of Survey for Repairs, &c for Glen Gelder, 15th March 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Gelder, 15th March 1899 1899, Report on Machinery for Glen Gelder, 14th March 1899 1899, Report of Survey for Repairs, &c for Glen Gelder, 30th October 1899 1899 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.