Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Foyle ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
The process of transferring a vessel to water, but not necessarily her completion.
29/10/1872 ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
The listed port to which a given vessel belongs.
Londonderry ( Iron Ships Report for Foyle, 18th December 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
Dublin ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
D Gillespie ( Iron Ships Report for Foyle, 18th December 1872 1872, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
Gillespie ( Engineer\'s Certificate for Foyle, 24th December 1872 1872 )
D McCallum ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873 )
D Galespie ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874 )
D Gillerpie ( Report of Survey for Repairs for Foyle, 19th January 1876 1876 )
Daniel Gillespie ( Engineer's Certificate for Foyle, 25th January 1876 1876 )
Bradley ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
M Child ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Location where a vessel’s survey was undertaken.
Newcastle ( Iron Ships Report for Foyle, 18th December 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872 )
Newcastle on Tyne ( Half Midship Section Plan for Foyle, 7th March 1872 1872 )
South Shields; Newcastle ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873 )
Dublin ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876 )
Whitehaven ( Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
Mumbles Flot; Swansea ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877 )
Swansea ( Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
Belfast ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Recorded information related to a vessel’s movements.
Newcastle; Ireland ( Iron Ships Report for Foyle, 18th December 1872 1872 )
South Shields; Dublin ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873 )
Dublin; Coasting ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876 )
Whitehaven; Cardiff ( Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
Mumbles Flot; Swansea; Dublin ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877 )
Belfast; Dublin ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
A vessel’s means of propulsion.
Steam ( Iron Ships Report for Foyle, 18th December 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
undefined ( Half Midship Section Plan for Foyle, 7th March 1872 1872 )
Is the steamer assisted by sail?
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Does the vessel possess an auxiliary power source?
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Is electric lighting fitted to the vessel?
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Unique identifier for a given ship, it is assigned by a builder.
Type and configuration of the engine(s) supplied for a vessel.
Direct Acting Inverted Two Cylinders ( Engineer\'s Certificate for Foyle, 24th December 1872 1872 )
Two Direct Acting ( Engineer's Certificate for Foyle, 25th January 1876 1876 )
Date in which construction of a vessel’s engines were completed.
1872 ( Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
The year in which a vessel’s construction is completed.
1872 ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cole Bros ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ships Report for Foyle, 18th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
The individual and/or organisation listed
Michael McChrystal ( Iron Ships Report for Foyle, 18th December 1872 1872 )
M McChrystal ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
James John Joyee ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877 )
Micheal McChristie ( Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
M Murphy Jnr ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Name of surveyor.
Thomas H Cooke ( Iron Ships Report for Foyle, 18th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873 )
John William Miles ( Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
Thomas Ashton ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877 )
J W Scullard ( Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
90A1; A & Cp ( Iron Ships Report for Foyle, 18th December 1872 1872 )
90A1; Record Damage Repair ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873 )
90A1 ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
90A1; Drp 74 ( Report of Survey for Repairs for Foyle, 5th November 1874 1874 )
90A1; Drp 76; S S no 1-76 ( Report of Survey for Repairs for Foyle, 19th January 1876 1876 )
90A1; Drp 76 ( Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
The name of the port/place of destination given.
Ireland ( Iron Ships Report for Foyle, 18th December 1872 1872 )
Dublin ( Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Coasting ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876 )
Cardiff ( Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
320 ( Iron Ships Report for Foyle, 18th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
199 ( Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874 )
340 ( Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877 )
Is machinery fitted at the aft of the vessel?
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ships Report for Foyle, 18th December 1872 1872, Half Midship Section Plan for Foyle, 7th March 1872 1872, Engineer\'s Certificate for Foyle, 24th December 1872 1872, Report of Survey for Repairs for Foyle, 31st October, 1873 1873, Annual Surveys Report for Foyle, 8th October 1874 1874, Report of Survey for Repairs for Foyle, 5th November 1874 1874, Report of Survey for Repairs for Foyle, 19th January 1876 1876, Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs, &c for Foyle, 13th May 1876 1876, Report of Survey for Repairs, &c for Foyle, 26th January 1877 1877, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877, Report of Survey for Repairs, &c for Foyle, 4th June 1879 1879 )
Broad categories and subdivisions of vessels related to their purpose or function.
Location of construction for a vessel’s engines.
South Shields ( Engineer's Certificate for Foyle, 25th January 1876 1876, Report of Survey for Repairs of Engines & Boilers, for Foyle, 22nd January 1877 1877 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.