Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1885 ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Earle's Shipbuilding & Engineering Co Ltd ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hull ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Location where a vessel’s survey was undertaken.

Location of Survey

Motherwell; Hull ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885 )

Motherwell; Liverpool ( Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885 )

Sunderland ( Engine Forgings Form for Flamingo, 1885 1885 )

Glasgow ( Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885 )

Hull ( Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885 )

London ( Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

A vessel’s means of propulsion.

Propulsion

undefined ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885 )

Steam ( Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

Physical arrangement of a ship’s masts, sails and rigging.

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/05/1885 ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

285 ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Screw Steamer ( Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Receipt for materials manufactured by David Colville & Sons for Flamingo, 1st April 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 26th February 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for materials manufactured by David Colville & Sons for Flamingo, 16th March 1885 1885, Receipt for Bar Manufactured by David Colville & Sons for Flamingo, 31st March 1885 1885, Receipt for Bars Manufactured by David Colville & Sons for Flamingo, 28th February 1885 1885, Tests of Boiler Steel for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 1885 1885, Engine Forgings Form for Flamingo, 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 9th April 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 14th March 1885 1885, Tests of Boiler Steel undertaken by William Andrews, for plates manufactured by D Colville & Sons of Motherwell for Flamingo, 11th March 1885 1885, Half Midship Section Plan for Flamingo, 1885 1885, Plan of Pumping Arrangement for Flamingo, 26th February 1885 1885, Plan of Steel Boiler for Flamingo, 29th January 1885 1885, Iron Ship Report for Flamingo, 2nd June 1885 1885, Report on Machinery for Flamingo, 2nd June 1885 1885, Report of Survey for Repairs, &c for Flamingo, 18th January 1889 1889, Report of Survey for Repairs, &c, of Engines & Boilers for Flamingo, 23rd January 1889 1889 )

Recorded information related to a vessel’s movements.

Voyage information

Hull; North Sea ( Iron Ship Report for Flamingo, 2nd June 1885 1885 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple compound Inverted Cylinders direct acting & Surface condensing ( Report on Machinery for Flamingo, 2nd June 1885 1885 )

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.