Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Fitzpatrick ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Fitz Patrick ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
The process of transferring a vessel to water, but not necessarily her completion.
26/10/1869 ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
3 ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880 )
100 ( Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
The individual and/or organisation listed
Robert Donaldson ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
R Donaldson ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Pecknan ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
Lu Puchuan ( Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
Lee Pei Chuan ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879 )
Lee Pee Chuah ( Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
Name of surveyor.
James Williamson; Henry J Boolds ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
William T Mumford ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Christopher Besant ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AA1; A & CP ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
Asterisk AA1; record damage repair; pt awning deck ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
AA1; Record Damage Repair ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
Asterisk AA1; S S No 3-78 ( Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
AA1; Qy Loadline Reported ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879 )
Asterisk AA1 ( Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
The name of the port/place of destination given.
Mediterranean ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
Gibraltar ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Penang ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
China Coast ( Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
923 ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
830 ( Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869 )
885 ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
1048 ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
Is machinery fitted at the aft of the vessel?
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Date in which construction of a vessel’s engines were completed.
1869 ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878 )
The year in which a vessel’s construction is completed.
1869 ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blackwood & Gordon ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
The listed port to which a given vessel belongs.
Glasgow ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Penang ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
Hong Kong ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878 )
undefined ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Linck ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Brumell ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
Humphries ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
Humphrus ( Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
John Towers ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879 )
Location where a vessel’s survey was undertaken.
Port Glasgow; Greenock ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
Port Glasgow ( Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Glasgow ( Half Midship Section Plan for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
London ( Calculations for Fitzpatrick, 1870 1870 )
Hong Kong ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
Port of Singapore ( Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879 )
Singapore ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880 )
Recorded information related to a vessel’s movements.
Port Glasgow; Clyde; Mediterranean ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869 )
Glasgow; Gibraltar ( Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871 )
Glasgow; Penang ( Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872 )
Hong Kong; China Coast ( Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878 )
Singapore; Penang ( Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880 )
A vessel’s means of propulsion.
Steam ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Is the steamer assisted by sail?
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Is electric lighting fitted to the vessel?
No ( Iron Ships Report for Fitzpatrick, 23rd November 1869 1869, Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869, Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Report of Survey for Repairs for Fitzpatrick, 28th January 1871 1871, Report of Survey for Repairs for Fitz Patrick, 15th June 1872 1872, Engineer's Certificate for Fitzpatrick, 13th August 1878 1878, Report of survey for Repairs, &c for Fitzpatrick, 14th August 1878 1878, Statement from Surveyor J Charles Fittock Certifying examination on request from Captain J Towers for Fitzpatrick, 26th April 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick, 4th June 1879 1879, Report of Survey for Repairs, &c for Fitzpatrick 15th June 1880 1880, Certificate of examination for Fitzpatrick, 5th June 1880 1880, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer ( Half Midship Section Plan for Fitzpatrick, 22nd June 1869 1869 )
undefined ( Half Midship Section Plan for Fitzpatrick, November 1870 1870, Half Midship Section Plan for Fitzpatrick, 1870 1870, Calculations for Fitzpatrick, 1870 1870, Plan of Fore & Main Hatch Way for Fitzpatrick, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Direct Acting, Inverted Cylidner Two in No ( Engineer's Certificate for Fitzpatrick, 13th August 1878 1878 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.