Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Fairmuir ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date )

Holderness ( Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date )

Yewglen ( Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/01/1915 ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

262 ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Ardrossan ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915 )

Glasgow ( Report on Boilers for Fairmuir, 8th December 1914 1914, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date )

Ardrossan; Glasgow ( Steel Steamer Report for Fairmuir, 17th March 1915 1915 )

Annan; Glasgow ( Report on Boilers for Fairmuir, 13th January 1915 1915 )

London ( Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915 )

Spalato ( Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924 )

Greenock ( Report of Surveys for Freeboard for Holderness, 16th May 1932 1932 )

Wokingham ( Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941 )

South Shields; Newcastle ( Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941 )

Sunderland ( Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941 )

South Shields ( Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The name of the port/place of destination given.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Reciprocating, Triple Expansion, Direct Acting, Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915 )

Triple Expansion ( Report on Machinery for Fairmuir, 13th March 1915 1915 )

The year in which a vessel’s construction is completed.

Year of ship completion

1915 ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Ardrossan Dry Dock & Shipbuilding Co Ltd ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Ardrossan ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

undefined ( Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to British Iron & Steel Corp for Breaking up ( Profile & Deck Plan for Fairmuir, 25th February 1909 1914, Midship Section Plan for Fairmuir, 25th February 1909 1914, Report on Boilers for Fairmuir, 8th December 1914 1914, Memo to the Chief Ship Surveyor regarding Holderness, 25th March 1915 1915, Steel Steamer Report for Fairmuir, 17th March 1915 1915, Form for Vessels of 100 Tons & Upwards for Fairmuir, 13th March 1915 1915, Report on Machinery for Fairmuir, 13th March 1915 1915, Report on Boilers for Fairmuir, 13th January 1915 1915, Freeboard Verification Form for Steamers for Fairmuir, 10th February 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 13th March 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, regarding Fairmuir, 26th January 1915 1915, Letter from Harry C Farrar, Glasgow Surveyor, to the Secretary for Lloyd's Register regarding Fairmuir, 26th January 1915 1915, Letter from E Aitken Luack, Managing Director for & on behalf of The Ardrossan Dry Dock & Shipbuilding Co Ltd, to Lloyd's Register, Glasgow, regarding Fairmuir, 15th January 1915 1915, Freeboard Application for Certificate of Approval for Fairmuir, 15th January 1915 1915, Copy of a letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding Fairmuir, 25th January 1915 1915, Memo about the Freeboard Report for Fairmuir, 25th January 1915 1915, Report of Surveys for Freeboard-Steam Ships for Yewglen, 10th April 1924 1924, Report of Surveys for Freeboard for Holderness, 16th May 1932 1932, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Holderness, May 1932 1932, Report of Surveys for Freeboard for Yewglen, 2nd December 1941 1941, Copy of a letter from the Clerk to the Classification Committee to the Newcastle Surveyors regarding Yewglen, 4th November 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for Yewglen, 3rd November 1941 1941, Report of Survey for Repairs, &c for Yewglen, 17th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 26th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Yewglen, 24th April 1941 1941, Report of Total Loss, Casualty, &c for Holderness, 21st April 1955 1955, Copy of Freeboard Report for Holderness, Undated no date, Freeboard & Draught Document for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Report of Surveys for Freeboard-Steam Ships for Fairmuir, Undated no date, Plan of New Forecastle Arrangement for Yewglen, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Recorded information related to a vessel’s movements.

Voyage information

Ardrossan; Coasting ( Steel Steamer Report for Fairmuir, 17th March 1915 1915 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.