Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Eva Peron ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date )
Fray Luis Beltran ( Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Fray Luis Beltram ( Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952 )
The process of transferring a vessel to water, but not necessarily her completion.
30/11/1951 ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
1206 ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Location where a vessel’s survey was undertaken.
Birkenhead ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Half Midship Section Plan for Eva Peron, 26th March 1952 1952 )
Renfrew; Glasgow ( Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950 )
London ( Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Manchester ( Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951 )
Liverpool ( Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952 )
Birkenhead; Liverpool ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date )
Buenos Aires ( Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960 )
A vessel’s means of propulsion.
undefined ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Steam ( Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952 )
Is the steamer assisted by sail?
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred for Comp ( Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950 )
+100A1; 3,52 Bkn; Carrying Petroleum in Bulk; Fitted for Oil Fuel 4,52; FP above 150 F; Lloyds A & CP; +LMC 3,52; CL WTB FD; Radar Syc ESD DF ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952 )
+LMC 3,52; CL ( Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952 )
See Minute on Liverpool F E Mchy Rpt ( Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952 )
+100A1; Carrying Petroleum in Bulk ( Report of Surveys for Freeboard for Eva Peron, Undated no date )
Class withdraw at Owners Request ( Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
National R4A Heavy Oil ( Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951 )
2 Steam Turbines With D R Gearing to One Screwshaft ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952 )
Double Reduction Impulse Reaction ( Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952 )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report of Surveys for Freeboard for Eva Peron, Undated no date )
The port in which a vessel is registered or permanently based.
Buenos Aires ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
12741 ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
The year in which a vessel’s construction is completed.
1951 ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cammell, Laird & Co Ltd ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Birkenhead ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Screw Steamer ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952 )
Tanker ( Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Is electric lighting fitted to the vessel?
No ( Longitudinal Section Plan for Eva Peron, 8th November 1948 1948, Plan of Rudder & Stern Frame for Fray Luis Beltran, 29th November 1948 1948, Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951, Half Midship Section Plan for Eva Peron, 26th March 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Fray Luis Beltram, April 1952 1952, Memo to the Chief Ship Surveyor regarding First Entry for Eva Peron, 7th May 1952 1952, Extract from freeboard verification of marking form for Eva Peron, 27th March 1952 1952, Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey for Eva Peron, 18th March 1952 1952, Copy of Certificate of Survey of Boilers & Machinery for Eva Peron, 18th March 1952 1952, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Eva Peron, 6th May 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Letter from C Newman Thomas, for The Surveyors, to The Secretary, London office, regarding Fray Luis Beltran, 18th July 1960 1960, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950 )
Lon ( Report on Steam Turbine Generating Machinery for Eva Peron, 24th August 1951 1951, Report of Ship Surveys & Repairs for Fray Luis Beltran, Undated no date )
Mch ( Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951 )
Liv ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952, Report on Electrical Equipment for Eva Peron, 26th March 1952 1952, Report of Surveys for Freeboard - Conditions of Assignment for Eva Peron, Undated no date, Report of Surveys for Freeboard for Eva Peron, Undated no date )
Location of construction for a vessel’s engines.
Birkenhead ( Report on Water Tube Boilers for Eva Peron, 31st December 1950 1950, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952 )
Ashton Under Lyne ( Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951 )
Date in which construction of a vessel’s engines were completed.
1951 ( Report on Oil Engine Electric Generator Sets for Eva Peron, 7th June 1951 1951 )
1952 ( Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LOAX ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952 )
The individual and/or organisation listed
Yacimientos Petroliferos Fiscales ( Steel Steamer or Motorship Report for Eva Peron, 1st April 1952 1952, Report on Steam Turbine Machinery for Eva Peron, 2nd April 1952 1952, Report on Water Tube Boilers for Eva Peron, 4th April 1952 1952, Report on Boilers for Eva Peron, 3rd April 1952 1952 )
The listed port to which a given vessel belongs.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.