Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Envoy ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/01/1872 ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hull ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879 )

Lon ( Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

The individual and/or organisation listed

Ship owner

Gee & Co ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873 )

William Liddell ( Engineer's Certificate for Envoy, 12th April 1872 1872 )

W Liddell ( Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881 )

W Bailey ( Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883 )

W S Bailey ( Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896 )

W J Bailey ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893 )

Bailey & Leetham Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Name of surveyor.

Surveyor

William Davidson ( Iron Ships Report for Envoy, 16th April 1872 1872 )

Samuel Pretious ( Annual Surveys Report for Envoy, 16th October 1873 1873 )

Samuel Pretious; William Parker ( Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875 )

James H Truscott ( Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894 )

J W Scullard ( Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877 )

William C Davey ( Annual Surveys Report for Envoy, 17th December 1877 1877, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887 )

Thomas Congdon ( Annual Surveys Report for Envoy, 25th October 1878 1878 )

Wilhelm Paulsen ( Annual Surveys Report for Envoy, 3rd October 1879 1879 )

George E Wilkinson ( Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893 )

John William Miles ( Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883 )

John William Miles; William C Davey ( Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884 )

Charles E Stromeyer ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890 )

George P Cooper ( Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888 )

Thomas L Gray ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890 )

Robert Balfour ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891 )

Thomas R Blackie ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896 )

Duncan Ritchie ( Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Recorded information related to a vessel’s movements.

Voyage information

Hull; Cape of Good Hope ( Iron Ships Report for Envoy, 16th April 1872 1872 )

London; Venice ( Annual Surveys Report for Envoy, 16th October 1873 1873 )

London; Mediterranean ( Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881 )

London; Trieste ( Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884 )

London; Catania; Adriatic ( Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886 )

Limehouse; Mediterranean ( Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887 )

London; St Petersburg ( Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893 )

London; Hull ( Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893 )

London; Hull; St Petersburg ( Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893 )

London; Copenhagen ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895 )

London; Baltic ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

London; Revel ( Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

1350 ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881 )

1031 ( Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 25th October 1878 1878 )

1353 ( Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

1553 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890 )

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

The year in which a vessel’s construction is completed.

Year of ship completion

1872 ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Gilbert & Cooper ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Location where a vessel’s survey was undertaken.

Location of Survey

Hull ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872 )

London ( Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Limehouse; London ( Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887 )

A vessel’s means of propulsion.

Propulsion

undefined ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Engineer's Certificate for Envoy, 12th April 1872 1872 )

Steam ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Sail ( Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Envoy, 1871 1871, Half Midship Section Plan for Envoy, 1871 1871, Profle Plan for Envoy, 1871 1871, Iron Ships Report for Envoy, 16th April 1872 1872, Engineer's Certificate for Envoy, 12th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

The listed port to which a given vessel belongs.

Port belonging to

Hull ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881, Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th April 1886 1886, Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887, Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Snow ( Iron Ships Report for Envoy, 16th April 1872 1872, Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877 )

W E Snow ( Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881 )

W Snow ( Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876 )

W C Snow ( Annual Surveys Report for Envoy, 17th December 1877 1877 )

Daniel Miltidt ( Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883 )

D Millist ( Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884 )

Nugent ( Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886 )

G J Nugent ( Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887 )

Migent ( Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888 )

J Taylor ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891, Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896, Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Taylor ( Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

90A1; A & CP; MC ( Iron Ships Report for Envoy, 16th April 1872 1872 )

90A1 ( Annual Surveys Report for Envoy, 16th October 1873 1873, Report of Survey for Repairs, &c for Envoy, 23rd July 1875 1875, Report of Survey for Repairs, &c for Envoy, 29th February 1876 1876, Annual Surveys Report for Envoy, 17th December 1877 1877, Annual Surveys Report for Envoy, 25th October 1878 1878, Annual Surveys Report for Envoy, 3rd October 1879 1879, Report of Survey for Repairs, &c for Envoy, 12th April 1883 1883, Report of Survey for Repairs, &c for Envoy, 22nd April 1886 1886, Report of Survey for Repairs, &c for Envoy, 13th April 1891 1891 )

90A1; S S No 1-77 ( Report of Survey for Repairs, &c for Envoy, 17th May 1877 1877 )

90A1; B & MS 3,81; SS No 2-81 ( Report of Survey for Repairs, &c for Envoy, 10th March 1881 1881 )

B & MS 3,81; Subject to Futher Survey of Boiler Assagain ( Report of Survey for Repairs of Engines & Boilers for Envoy, 14th March 1881 1881 )

90A1; LMC 8,84; SS No 3,84 ( Report of Survey for Repairs, &c for Envoy, 22nd August 1884 1884 )

LMC 8,84 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 19th August 1884 1884 )

90A1; BS 6,87 ( Report of Survey for Repairs, &c for Envoy, 12th May 1887 1887 )

BS 6,87 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th June 1887 1887 )

90A1 12/87 ( Report of Survey for Repairs, &c for Envoy, 1st March 1888 1888 )

Deferred for Compltn ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 11th April 1890 1890 )

Deferred for Completion ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 5th June 1890 1890 )

B S 4,90 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 4th July 1890 1890 )

+90A1 4,89 +NB 81; LMC 4,89 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 17th April 1891 1891 )

Deferred for Compln of No 2; LMC 4,93 ( Report of Survey for Repairs, &c for Envoy, 28th April 1893 1893 )

LMC 4,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 20th April 1893 1893 )

Deferred for Compln of No 2 ( Report of Survey for Repairs, &c for Envoy, 14th August 1893 1893 )

Deferred for Completion of No 2 ( Report of Survey for Repairs, &c for Envoy, 20th September 1893 1893, Report of Survey for Repairs, &c for Envoy, 31st October 1893 1893 )

BS 3,94 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 13th March 1894 1894 )

90A1; BS 3,94 ( Report of Survey for Repairs, &c for Envoy, 8th March 1894 1894 )

+90A1 3,94; SS Lon No 3 8,84; SS Lon 2,93; +NB 81; LMC 4,93; BS 3,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 7th March 1895 1895 )

BS 3,95 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 25th March 1895 1895 )

+90A1 3,94; S S Lon No 3,8,84; S S Lon No 2-93; LMC 4,93; +NB 81; BS 3,95 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 15th January 1896 1896 )

+90A1 ( Report of Survey for Repairs, &c for Envoy, 27th February 1896 1896 )

+90A1 3,94; SS Lon No 3-8,84; SS Lon No 2-93; +NB 81; LMC 4,93; BS 3,95 ( Report of Survey for Repairs, &c, of Engines & Boilers for Envoy, 3rd March 1896 1896 )

Deferred for Completion of No 3 ( Report of Survey for Repairs, &c, of Engines & Boilers, for Envoy, 21st August 1897 1897 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

A Pair of Direct Acting, Inverted, Compound, Surface Condensing Engines ( Engineer's Certificate for Envoy, 12th April 1872 1872 )

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.