Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/09/1846 ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv ( Survey Report for Envoy, May 1847 1847 )
Lon ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
The individual and/or organisation listed
J Haycack ( Survey Report for Envoy, May 1847 1847 )
Heycock ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
Name of surveyor.
Robert Hamilton ( Survey Report for Envoy, May 1847 1847 )
James Martin ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 4 Years ( Survey Report for Envoy, May 1847 1847 )
AE1 ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
The name of the port/place of destination given.
Narva ( Survey Report for Envoy, May 1847 1847 )
Melbourn ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
146 ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
The year in which a vessel’s construction is completed.
1846 ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
The port or place in which the vessel’s construction took place, at the time of writing.
Nova Scotia ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
The listed port to which a given vessel belongs.
Wells ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James Kew ( Survey Report for Envoy, May 1847 1847 )
John Smith ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
Location where a vessel’s survey was undertaken.
Liverpool ( Survey Report for Envoy, May 1847 1847 )
London ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
Recorded information related to a vessel’s movements.
Liverpool; Narva ( Survey Report for Envoy, May 1847 1847 )
London; Melbourne ( Annual Surveys Report for Envoy, 7th March 1853 1853 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
Wood ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Survey Report for Envoy, May 1847 1847, Annual Surveys Report for Envoy, 7th March 1853 1853 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.