Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

El Mirlo ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/07/1930 ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

29 ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958 )

undefined ( Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Screw Motor Vessel ( Steel Motorship Report for El Mirlo, 30th September 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930 )

Cargo ( Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 9,30; Carrying Petroleum in bulk; Lloyd's A & CP; +LMC 9,30; 2DB 180 lb; Longitudinal Framing ( Steel Motorship Report for El Mirlo, 30th September 1930 1930 )

+LMC 9,30; 2DB 180 lb ( Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930 )

See Accompanying Report ( Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930 )

Elec Light ( Report on Electric Fittings for El Mirlo, 19th September 1930 1930 )

+100A1; Carrying Petroleum in bulk ( Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932 )

+100A1 1,57; SS (Dr) 8,52; Grk 1,57; +LMC CS 1,57; BS D 1,57; TS 2,55; CL; Carrying Petroleum in bulk ( Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958 )

+100A1; Carrying Petroleum in bulk 1,57; SS Grk 1,57; (Dr) 8,52; +LMC CS 1,57; Blr d 1,57; CL 2,55 ( Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958 )

Physical arrangement of a ship’s masts, sails and rigging.

The name of the port/place of destination given.

The year in which a vessel’s construction is completed.

Year of ship completion

1930 ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Blythswood Shipbuilding Co Ltd ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Steel Motorship Report for El Mirlo, 30th September 1930 1930 )

Scotstoun, Glasgow ( Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930 )

London ( Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958 )

Greenock ( Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930 )

Greenock; Glasgow ( Report on Electric Fittings for El Mirlo, 19th September 1930 1930 )

Southampton ( Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932 )

Rotterdam ( Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953 )

Bordeaux ( Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958 )

Pauillac; Bordeaux ( Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958 )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958 )

Steam ( Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932 )

undefined ( Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Shipbreakers ( Request for Special Survey for El Mirlo, 30th October 1929 1929, Stern Frame & Rudder Plan for El Mirlo, 26th November 1929 1929, Memo to the Chief Ship Surveyor regarding First Entry for El Mirlo, 3rd October 1930 1930, Steel Motorship Report for El Mirlo, 30th September 1930 1930, Form for Vessels of 100 Tons & Upwards for El Mirlo, 19th September 1930 1930, Copy of a Certificate of Survey for Unknown, 30th June 1930 1930, Copy of a Certificate of Survey of Boilers & Machinery for El Mirlo, 24th September 1930 1930, Report on Oil Engine Machinery for El Mirlo, 28th July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Boilers for El Mirlo, 3rd July 1930 1930, Report on Electric Fittings for El Mirlo, 19th September 1930 1930, Half Midship Section Plan for El Mirlo, 17th September 1930 1930, Profile & Decks Plan for El Mirlo, 17th September 1930 1930, Report of Surveys for Freeboard for El Mirlo, 12th July 1932 1932, Report C.11 continued memorandum of alterations since ship surveyed for assignment of load lines for El Mirlo, 3rd August 1953 1953, Report of Total Loss, Casualty, &c for El Mirlo, 13th February 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register regarding El Mirlo, 29th January 1958 1958, Copy of Letter from Assistant Clerk to the Classification Committee, to C T Bowring & Co Ltd, London, regarding El Mirlo, 28th January 1958 1958, Letter from G J Meares, Ships Manager, for C T Bowring & Co Ltd, to the Secretary of Lloyd's Register, regarding El Mirlo, 28th January 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class for El Mirlo, 27th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Copy of a Certificate of Survey of Machinery for El Mirlo, 16th January 1958 1958, Report of Survey for Repairs, &c, of Engines & Boilers for El Mirlo, 21st January 1958 1958, Copy of Freeboard Report for El Mirlo, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Recorded information related to a vessel’s movements.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.