Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Dilwara ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
The process of transferring a vessel to water, but not necessarily her completion.
03/11/1891 ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Unique identifier for a given ship, it is assigned by a builder.
217 ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Location where a vessel’s survey was undertaken.
Glasgow ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
A vessel’s means of propulsion.
Steam ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
undefined ( Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892 )
Is the steamer assisted by sail?
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
The listed port to which a given vessel belongs.
Glasgow ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A Morris ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891 )
Morris ( Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892 )
A W Mann ( Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893 )
Mann ( Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891 )
Name of surveyor.
Walter E Robson ( Report on Machinery for Dilwara, 29th December 1891 1891 )
Frank Cook ( Engine Forgings Form for Dilwara, 29th June 1891 1891 )
Henry Hand ( Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893 )
A McKeand ( Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Direct acting Triple Expansion ( Report on Machinery for Dilwara, 29th December 1891 1891 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1891 ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A & J Inglis ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892 )
Screw Steamer ( Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Does the vessel possess an auxiliary power source?
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Is electric lighting fitted to the vessel?
No ( Plan of Boilers for Dilwara, April 1890 1890, Plan of Rigging for Dilwara, 19th June 1890 1890, Descriptive Longitudinal Plan for Dilwara, 3rd March 1890 1890, Half Midship Section Plan for Dilwara, 1890 1890, Longitudinal Section Shewing Pumping Arrangement Plan for Dilwara, 11th July 1890 1890, Longitudinal Section & Deck Half Midship Section Plan for Dilwara, 1890 1890, Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Dilwara, 30th December 1891 1891, Engine Forgings Form for Dilwara, 29th June 1891 1891, Engine Forgings Form for Dilwara, 1st August 1891 1891, Half Midship Section Plan for Dilwara, 30th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report on Electric Lighting Installation for Dilwara, 1st January 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
The individual and/or organisation listed
British India Associated Steamers ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
British India Associated Ltd ( Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; La & Cp; +LMC 12,91; 3Dks(2 Steel-Ws); & Web Frames ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891 )
+LMC 12,91 ( Report on Machinery for Dilwara, 29th December 1891 1891 )
+100A1 ( Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893 )
+100A1 9,92; +LMC 12,91 ( Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5441 ( Iron or Steel Steamer Report for Dilwara, 26th December 1891 1891, Report on Machinery for Dilwara, 29th December 1891 1891, Report of Survey for Repairs, &c for Dilwara, 8th September 1892 1892, Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Dilwara, 20th December 1893 1893 )
Recorded information related to a vessel’s movements.
Glasgow ( Report on Machinery for Dilwara, 29th December 1891 1891 )
Glasgow; India ( Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893 )
Location of construction for a vessel’s engines.
The name of the port/place of destination given.
India ( Report of Survey for Repairs, &c for Dilwara, 14th December 1893 1893 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.