Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Degama ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
29/12/1898 ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
240 ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl ( Report on Machinery for Degama, 11th March 1899 1889, Steel Steamer Report for Degama, 15th March 1899 1899 )
The individual and/or organisation listed
Elder Dempster & Co ( Report on Machinery for Degama, 11th March 1899 1889, Steel Steamer Report for Degama, 15th March 1899 1899 )
Alfred Lewis Jones ( Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Name of surveyor.
W J Smith ( Report on Machinery for Degama, 11th March 1899 1889 )
F W Pitt ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899 )
Charles E Burney ( Steel Steamer Report for Degama, 15th March 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899 )
Hugh Cameron ( Ship Forgings form for Degama, 10th October 1898 1899 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 3,99 ( Report on Machinery for Degama, 11th March 1899 1889 )
+100A1 Steel; A & CP Spar dk; +LMC 3,99 ( Steel Steamer Report for Degama, 15th March 1899 1899 )
+100A1 (Steel) Sqar Duke; 1dk (Steel) & Sqar dk (Steel) & Deep Framing ( Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899 )
A vessel’s means of propulsion.
Steam ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
undefined ( Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899 )
Is the steamer assisted by sail?
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Degama, 11th March 1899 1889 )
Inverted Direct acting Triple Expansion Condensing ( Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Date in which construction of a vessel’s engines were completed.
1899 ( Report on Machinery for Degama, 11th March 1899 1889, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Is machinery fitted at the aft of the vessel?
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
The name of the port/place of destination given.
Tyne ( Steel Steamer Report for Degama, 15th March 1899 1899 )
The port in which a vessel is registered or permanently based.
Liverpool ( Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
The year in which a vessel’s construction is completed.
1899 ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899 )
1898 ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness, Withy & Co Ltd ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899 )
Furness Withy & Co Ltd ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
The listed port to which a given vessel belongs.
Liverpool ( Report on Machinery for Degama, 11th March 1899 1889, Steel Steamer Report for Degama, 15th March 1899 1899 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Sheldrake ( Report on Machinery for Degama, 11th March 1899 1889 )
F Sheldrake ( Steel Steamer Report for Degama, 15th March 1899 1899 )
Location where a vessel’s survey was undertaken.
Hartlepool ( Report on Machinery for Degama, 11th March 1899 1889 )
West Hartlepool ( Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899 )
Leeds; Hartlepool; Manchester ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899 )
Spennymoor ( Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898 )
Newcastle on Tyne; West Hartlepool ( Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898 )
West Hartlepool; Hartlepool ( Steel Steamer Report for Degama, 15th March 1899 1899 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Sunderland ( Ship Forgings form for Degama, 10th October 1898 1899 )
Leeds ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899 )
Screw Steamer ( Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Hartlepool ( Report on Machinery for Degama, 11th March 1899 1889, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Is electric lighting fitted to the vessel?
No ( Report on Machinery for Degama, 11th March 1899 1889, Plan of Pumping Arrangement for Degama, 25th October 1898 1898, Profile Plan for Degama, 26th April 1898 1898, Half Midship Section Plan for Degama, 26th April 1898 1898, Plan of Two Boilers for Degama, 18th April 1898 1898, Plan of Cast Steel Rudder Frame for Degama, 9th June 1898 1898, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 9th July 1898 1898, Surveyors Advice of Tests of Steel for Degama, 14th July 1898 1898, Receipt for Steel Bars manufactured by John Spencer & Sons Ltd for Degama, 11th August 1898 1898, Surveyors Advice of Tests of Steel for Degama, 5th August 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 14th May 1898 1898, Receipt for Steel manufactured by John Spencer & Sons Ltd for Degama, 17th May 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 12th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 20th May 1898 1898, Surveyors Advice of Tests of Steel for Degama, 15th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 4th June 1898 1898, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Degama, 27th May 1898 1898, Receipt for material manufactured by John Spencer & Sons Ltd for Degama, 31st May 1898 1898, Steel Steamer Report for Degama, 15th March 1899 1899, Form for Vessels of 100 Tons & Upwards for Degama, 10th March 1899 1899, Form from Thomas Watt to The Secretary of Lloyd's Register forwarding the Midship Section for Degama, 9th March 1899 1899, Ship Forgings form for Degama, 10th October 1898 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 19th July 1899 1899, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Degama, 15th July 1899 1899, Letter from C E Burney, Surveyor of Lloyd's Register, West Hartlepool, to the Secretary of Lloyd's Register, London, confirming moulded depth in First Entry Report for Degama, 18th March 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding class of Degama, 16th March 1899 1899, Envelope containing Boiler Forms for Degama, Undated no date )
Recorded information related to a vessel’s movements.
West Hartlepool; Tyne ( Steel Steamer Report for Degama, 15th March 1899 1899 )
Physical arrangement of a ship’s masts, sails and rigging.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.