Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
Unique identifier for a given ship, it is assigned by a builder.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
R C Macanghton & Co ( Iron Ship Report for Deanfield, 6th May 1878 1878 )
R C Macanighton ( Annual Surveys Report for Deanfield, 15th October 1879 1879 )
W H Ross & Co ( Annual Surveys Report for Deanfield, 19th July 1883 1883, Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Name of surveyor.
Henry J Boolds ( Iron Ship Report for Deanfield, 6th May 1878 1878 )
Heinrich Paasch ( Annual Surveys Report for Deanfield, 15th October 1879 1879 )
Senhouse Martindale ( Annual Surveys Report for Deanfield, 19th July 1883 1883, Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
The name of the port/place of destination given.
Melbourne ( Iron Ship Report for Deanfield, 6th May 1878 1878 )
Shanghai ( Annual Surveys Report for Deanfield, 15th October 1879 1879 )
Calcutta ( Annual Surveys Report for Deanfield, 19th July 1883 1883 )
Cape Town ( Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ship Report for Deanfield, 6th May 1878 1878, Annual Surveys Report for Deanfield, 15th October 1879 1879, Annual Surveys Report for Deanfield, 19th July 1883 1883, Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Broad categories and subdivisions of vessels related to their purpose or function.
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
Port Glasgow; Greenock ( Iron Ship Report for Deanfield, 6th May 1878 1878 )
Antwerp ( Annual Surveys Report for Deanfield, 15th October 1879 1879 )
London ( Annual Surveys Report for Deanfield, 19th July 1883 1883, Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Recorded information related to a vessel’s movements.
Port Glasgow; Melbourne ( Iron Ship Report for Deanfield, 6th May 1878 1878 )
Antwerp; Antwerp; Shanghai ( Annual Surveys Report for Deanfield, 15th October 1879 1879 )
London; Calcutta ( Annual Surveys Report for Deanfield, 19th July 1883 1883 )
London; Cape Town ( Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
A vessel’s calculated maximum speed.
1884 ( Report of Survey for Repairs, &c for Deanfield, 3rd September 1884 1884 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.