Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Danube ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
The process of transferring a vessel to water, but not necessarily her completion.
10/03/1894 ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Unique identifier for a given ship, it is assigned by a builder.
102 ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
A vessel’s means of propulsion.
Steam ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Is the steamer assisted by sail?
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
The listed port to which a given vessel belongs.
Hull ( Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894 )
Name of surveyor.
Robert Williamson ( Iron Steamer report for Danube, 9th April 1894 1894 )
James Innes ( Report on Machinery for Danube, 9th April 1894 1894 )
John C Craig ( Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894 )
Recorded information related to a vessel’s movements.
Beverley; Fishing ( Iron Steamer report for Danube, 9th April 1894 1894 )
Physical arrangement of a ship’s masts, sails and rigging.
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Direct Acting ( Report on Machinery for Danube, 9th April 1894 1894 )
Compound Direct Acting Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894 )
Date in which construction of a vessel’s engines were completed.
1894 ( Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894 )
The year in which a vessel’s construction is completed.
1894 ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Cooper ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
The name of the yard where the vessel was built.
Grovehill ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Location where a vessel’s survey was undertaken.
Hull ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894 )
Beverley; Hull ( Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894 )
Stockton on Tees ( Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894 )
Newcastle ( Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894 )
Blackhill; Hull ( Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894 )
Newcastle-on-Tyne ( Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Does the vessel possess an auxiliary power source?
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Is electric lighting fitted to the vessel?
No ( Plan of Steel Boiler for Danube, 13th December 1893 1893, Half Midship Section Plan for Danube, 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 22nd December 1893 1893, Press Copy of Steel Test Certificate for Danube, 22nd December 1893 1893, Press Copy Receipt of Steel Plate for 2 Boilers built by C D Holmes, one of them for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 23rd December 1893 1893, Press Copy of Note regarding Steel Plate for Danube, 27th December 1893 1893, Plan of Half Midship Section for Danube, 1893 1893, Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894, Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Danube, 24th January 1894 1894, Form from W Rowell to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 11th April 1894 1894, Engine Forgings or Castings Form for Danube, 22nd January 1894 1894, Receipt for Steel manufactured by Consett Iron Co Ltd for Danube, 30th January 1894 1894, Ship Forgings or Castings Form for Danube, 24th February 1894 1894, Letter from R Wayton to The Secretary of Lloyd's Register forwarding Midship Section for Danube, 7th January 1899 1899 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Iron Steamer report for Danube, 9th April 1894 1894, Report on Machinery for Danube, 9th April 1894 1894 )
The individual and/or organisation listed
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Steam Trawler; 1 Dk; +LMC 4,94 ( Iron Steamer report for Danube, 9th April 1894 1894 )
+LMC 4,94 ( Report on Machinery for Danube, 9th April 1894 1894 )
The name of the port/place of destination given.
Fishing ( Iron Steamer report for Danube, 9th April 1894 1894 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
The port in which a vessel is registered or permanently based.
Hull ( Form for Vessels of 100 Tons & Upwards for Danube, 10th April 1894 1894 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.