Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Crossgar ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Midship Section Plan for Crossgar, Undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Ballygrainey ( Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
06/10/1936 ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
988 P ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Report of Surveys for Freeboard for Crossgar, Undated no date )
Belfast ( Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962 )
Clydebank; Glasgow ( Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936 )
London; Belfast ( Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Is electric lighting fitted to the vessel?
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
The official record pronounced by the Committee
Broken up ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Holland ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Report of Surveys for Freeboard for Crossgar, Undated no date )
Bel ( Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
The individual and/or organisation listed
John Kelly Ltd ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Report of Surveys for Freeboard for Crossgar, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 11,36; Lloyds A & CP; +LMC 11,36 ( Steel Steamer Report for Crossgar, 4th December 1936 1936 )
+LMC 11,36 ( Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936 )
See Accompanying Machinery Report ( Report on Boilers for Crossgar, 28th November 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936 )
Transmit to London ( Report on Boilers for Crossgar, 7th August 1936 1936 )
Deferred for SS; But Postponement SS Until 7,62 Approved; DS 8,61; TS 8,61; MBS 8,61 ( Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961 )
Deferred for Comp ES; But Assign TS 8,61; MBS 8,61 ( Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
+100A1 8,61; SS 7,57; +LMC 7,57; BS M 8,61; Sp 7,57; TS 8,61; CL ( Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962 )
+100A1 (Contemp) ( Report of Surveys for Freeboard for Crossgar, Undated no date )
Location of construction for a vessel’s engines.
Clydebank ( Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
MMCB ( Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936 )
Date in which construction of a vessel’s engines were completed.
1936 ( Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
Name of surveyor.
H C Murray ( Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962 )
The year in which a vessel’s construction is completed.
1936 ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A & J Inglis Ltd ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
A vessel’s means of propulsion.
undefined ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Copy of Freeboard Report for Crossgar, Undated no date )
Steam ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date )
Is the steamer assisted by sail?
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Demolition commenced ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
Recorded date for the vessel’s loss or disposal.
__/06/1962 ( Longitudinal Section & Deck Plans for Crossgar, 20th February 1936 1936, Plan of Stern Frame & Rudder for Crossgar, 20th February 1936 1936, Memo to the Chief Ship Surveyor regarding First Entry for Ballygrainey, 10th December 1936 1936, Steel Steamer Report for Crossgar, 4th December 1936 1936, Request for Special Survey for Crossgar, 2nd March 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Certificate for Test of Generator for Crossgar, 17th September 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Memo from Belfast regarding postponed Special Survey for Ballygrainey, 19th September 1961 1961, Remarks of the Chief Ship Surveyor regarding record assigned to Ballygrainey, 14th September 1961 1961, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for Ballygrainey, 15th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Copy of a letter from the Deputy Clerk to the Classification Committee to the Rotterdam Surveyors regarding Ballygrainey, 24th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Copy of a letter from H C Murray, for the Belfast Surveyor, to the Secretary for Lloyd\'s Register regarding Ballygrainey, 2nd July 1962 1962, Question & Answer Memo between London & Belfast Offices regarding postponed Special Survey for Ballygrainey, 15th May 1962 1962, Midship Section Plan for Crossgar, Undated no date, Reciprocating Steam Engine Surveys for Ballygrainey, undated no date, Report of Surveys for Freeboard for Crossgar, Undated no date, Copy of Freeboard Report for Crossgar, Undated no date )
The port in which a vessel is registered or permanently based.
Belfast ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Report of Surveys for Freeboard for Crossgar, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W Clint ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Report of Surveys for Freeboard for Crossgar, Undated no date )
William Clint ( Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936 )
E W P King ( Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
661 ( Steel Steamer Report for Crossgar, 4th December 1936 1936, Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 28th November 1936 1936, Report on Boilers for Crossgar, 7th August 1936 1936, Report on Electrical Equipment for Crossgar, 23rd November 1936 1936, Report of Ship Surveys & Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Repairs for Ballygrainey, 10th August 1961 1961, Copy of a Certificate of Survey of Boiler & Part Machinery for Ballygrainey, 5th September 1961 1961, Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961, Report of Total Loss, Casualty, &c for Ballygrainey, 18th July 1962 1962, Report of Surveys for Freeboard for Crossgar, Undated no date )
640 ( Request for Special Survey for Crossgar, 2nd March 1936 1936 )
Recorded information relating the specific cargo being conveyed.
Oil in Bulk ( Request for Special Survey for Crossgar, 2nd March 1936 1936 )
Type and configuration of the engine(s) supplied for a vessel.
Steam Reciprocating Vertical Direct Acting ( Form for Vessels of 100 Tons & Upwards for Crossgar, 25th November 1936 1936 )
Triple Expansion ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Crossgar, 11th December 1936 1936, Report on Steam Reciprocating Engine Machinery for Crossgar, 28th November 1936 1936 )
T 3 Cylinders ( Report of Periodical Surveys & Repairs of Machinery for Ballygrainey, 5th September 1961 1961 )
The listed port to which a given vessel belongs.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.