Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Cliona ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Avon Venturer ( Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955 )
Avony ( Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
14/05/1931 ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
908 ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Location where a vessel’s survey was undertaken.
Leith ( Engine Forgings Form for Cliona, 5th March 1926 1926 )
London ( Profile & Deck Plans for Cliona, 1930 1930, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931 )
Glasgow ( Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931 )
Belfast ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Report on Boilers for Cliona, 19th February 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931 )
Amsterdam ( Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931 )
Newcastle ( Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
Cardiff ( Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955 )
London; Stockholm ( Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963 )
A vessel’s means of propulsion.
Steam ( Engine Forgings Form for Cliona, 5th March 1926 1926, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954 )
Motor (internal combustion) ( Profile & Deck Plans for Cliona, 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date )
undefined ( Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Memo of recommendations for classification of Avony, 19th June 1963 1963, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Is the steamer assisted by sail?
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Santander ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
The individual and/or organisation listed
The Anglo Saxon Petroleum Co Ltd ( Request for Special Survey for Cliona, 12th April 1930 1930, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Anglo Saxon Petroleum Co Ltd ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Steel Motorship Report for Cliona, 17th October 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Report on Boilers for Cliona, 19th February 1931 1931 )
Gls ( Steel Motorship Report for Cliona, 17th October 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931 )
Ams ( Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931 )
Nwc ( Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
Cff ( Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Glasgow Report No 51840 ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931 )
+100A1 10,31; Carrying Petroleum in Bulk; Lloyds A & CP; +LMC 10,31; 2 DB 150lb; Longitudinal Framing at Bottom & at Deck ( Steel Motorship Report for Cliona, 17th October 1931 1931 )
+LMC 10,31; 2 DB 150 lb ( Report on Oil Engine Machinery for Cliona, 16th October 1931 1931 )
See Accompanying Machinery Report ( Report on Boilers for Cliona, 17th October 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931 )
Elec Light ( Report on Electric Fittings for Cliona, 10th October 1931 1931 )
+100A1; Carrying Petroleum in Bulk ( Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
Tanker at Present ( Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954 )
+100A1; Ore Carrier 6,62; SS Dr 11,55; 12,59; +LMC CS 12,59; BS A 1,62; SP 1,62; TS P 6,62; S 1,61; CL ( Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date )
Location of construction for a vessel’s engines.
Glasgow ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931 )
Finnieston ( Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Amsterdam ( Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931 )
The port in which a vessel is registered or permanently based.
London ( Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
Bristol ( Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Archibald Scott Debenham ( Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Type and configuration of the engine(s) supplied for a vessel.
Vertical Internal Combustion ( Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Oil Engines 4 S C S A ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931 )
Vertical Reciprocating ( Report on Oil Engine Machinery for Cliona, 16th October 1931 1931 )
Kromhout Oil Engine ( Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931 )
Has the vessel been converted/rebuilt/lengthened?
Conversion ( Deck Plan for Avon Venturer, 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955 )
The year in which a vessel’s construction is completed.
1931 ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Engine Forgings Form for Cliona, 5th March 1926 1926 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Is electric lighting fitted to the vessel?
No ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
The official record pronounced by the Committee
To be broken up ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Santander ( Engine Forgings Form for Cliona, 5th March 1926 1926, Profile & Deck Plans for Cliona, 1930 1930, Plan of Rudder & Stern Post for Cliona, 29th March 1930 1930, Request for Special Survey for Cliona, 12th April 1930 1930, Memo for Cliona, 30th December 1930 . 1930, Report on Air Reservoirs for Cliona, 18th December 1930 1930, Plan of Hull Section for Cliona, 25th November 1931 1931, Letter from P L Warlow, Secretary to the Glasgow Committee, per W M L, to The Secretary, London, regarding Cliona, 27th October 1931 1931, Copy of a Letter from pro Secretary, to The Secretary, Glasgow, regarding Cliona, 26th October 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Cliona, 23rd October 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, List of Marks on Forgings & Dates of Tests for Cliona, 19th May 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Copy of a Certificate of Examination for Cliona, 14th April 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Letter from R Lee Annear, to The Secretary, London, regarding Cliona, 2nd January 1931 1931, Copy of a Letter from Secretary, to The Surveyors, Belfast, regarding Cliona, 1st January 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 20th May 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Cliona, 9th May 1942 1942, Report of Surveys for Freeboard for Avon Venturer, 14th December 1954 1954, Deck Plan for Avon Venturer, 1955 1955, Plan of General Arrangement for Avon Venturer, 10th December 1955 1955, Plan of Transverse Sections for Avon Venturer, 8th February 1955 1955, Report of Surveys for Freeboard - Condition of Assignment for Avon Venturer , 28th October 1955 1955, Remarks of the Chief Ship Surveyor, regarding class of Avony, 13th July 1962 1962, Copy of Question & Answer Memo between London & Stockholm Office, regarding Avony being breaking up, 16th July 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony, 6th August 1963 1963, Question & Answer Memo between London & Stockholm Offices, regarding Avony being breaking up, 16th July 1963 1963, Memo of recommendations for classification of Avony, 19th June 1963 1963, Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date, Motor Ships Form for Avony, Undated no date, Motorships for Avony, Undated no date, Note for Cliona, Undated no date, Copy of Freeboard Report for Cliona, Undated no date )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Request for Special Survey for Cliona, 12th April 1930 1930, Memo to the Chief Ship Surveyor regarding First Entry for Cliona, 22nd October 1931 1931, Steel Motorship Report for Cliona, 17th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
The listed port to which a given vessel belongs.
London ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8375 ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Steel Motorship Report for Cliona, 17th October 1931 1931, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Certificate of Survey of Machinery for Cliona, 14th October 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931, Report on Electric Fittings for Cliona, 10th October 1931 1931, Report of Surveys for Freeboard for Avon Venturer, 17th May 1932 1932 )
8675 ( Report of Total Loss, Casualty, Breaking up, etc for Avony, Undated no date )
Date in which construction of a vessel’s engines were completed.
1931 ( Report on Air Reservoirs for Cliona, 18th December 1930 1930, Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931, Report on Oil Engine Machinery for Cliona, 16th October 1931 1931, Report on Oil Engine Electric Generator Sets for Cliona, 11th April 1931 1931, Report on Boilers for Cliona, 17th October 1931 1931, Report on Boilers for Cliona, 19th February 1931 1931, Report on Air Reservoirs for Cliona, 19th October 1931 1931 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LHGW ( Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Form for Vessels of 100 Tons & Upwards for Cliona, 23rd September 1931 1931 )
Name of surveyor.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.