Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Cambric ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
The process of transferring a vessel to water, but not necessarily her completion.
08/02/1906 ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Unique identifier for a given ship, it is assigned by a builder.
235 ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Location where a vessel’s survey was undertaken.
Gateshead on Tyne ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905 )
Sunderland ( Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906 )
Hull ( Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
Gateshead; Newcastle on Tyne ( Report on Boilers for Cambric, 26th January 1906 1906 )
London ( Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917 )
Newcastle on Tyne ( Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914 )
A vessel’s means of propulsion.
Steam ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
undefined ( Half Midship Section Plan for Cambric, 27th June 1905 1905, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914 )
Is the steamer assisted by sail?
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Sunderland; Cardiff; Rio Janerio ( Steel Steamer Report for Cambric, 13th March 1906 1906 )
Physical arrangement of a ship’s masts, sails and rigging.
Name of surveyor.
A Boyd ( Report on Machinery for Cambric, 6th March 1906 1906 )
Thomas Field; A Boyd ( Report on Boilers for Cambric, 26th January 1906 1906 )
Matthew Blackwood ( Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917 )
Location of construction for a vessel’s engines.
Sunderland ( Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HFQS ( Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906 )
The year in which a vessel’s construction is completed.
1906 ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sunderland Shipbuilding Co Ltd ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Screw Steamer ( Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Is electric lighting fitted to the vessel?
No ( Plan of Horizontal Multitubular Boiler for Cambric, 12th July 1905 1905, Plan of Boiler for Cambric, 20th June 1905 1905, Half Midship Section Plan for Cambric, 27th June 1905 1905, Plan of Alternate Arrangement of Frames &c for Cambric, 27th June 1905 1905, Profile Plan for Cambric, 27th June 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Cambric, 14th March 1906 1906, Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 9th October 1914 1914, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 30th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 1st October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 29th September 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th July 1914 1914, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 9th July 1914 1914, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 6th July 1914 1914, Return Form for Arrival of Vessels Not Requiring Inspection for Cambric, 3rd July 1914" 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 7th October 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 13th August 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 30th March 1915 1915, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 29th May 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 19th December 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 16th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 15th December 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 24th August 1916 1916, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd August 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd August 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 10th April 1916 1916, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 3rd August 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 3rd August 1917 1917, Letter from F C Smith, to The Secretary, London, regarding Cambric, 2nd August 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 28th June 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 27th June 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the no 2 survey partly held for Cambric, 26th March 1917 1917, Letter from W Rowell, per The Surveyors, to The Secretary, London, regarding Cambric, 23rd March 1917 1917, Copy of Letter from Secretary, to The Surveyors, Hull, regarding Cambric, 22nd March 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of First SS No 2 of Cambric, 28th September 1917 1917, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report on Masts, Spars, & Rigging for Cambric, 22nd August 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917, Copy of Letter from W H Cockerline & Co, Hull, regarding Cambric, 12th August no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906 )
Nwc ( Report on Boilers for Cambric, 26th January 1906 1906 )
Hul ( Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
The individual and/or organisation listed
W H Cockerline & Co ( Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Form of Postponed Surveys for Cambric, 8th October 1914 1914, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
Walter Herbert Cockerline ( Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & Cp; +LMC 3,06 ( Steel Steamer Report for Cambric, 13th March 1906 1906 )
+LMC 3,06 ( Report on Machinery for Cambric, 6th March 1906 1906 )
+100A1; SS N 2 BS 9,17 ( Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917 )
BS 9,17 ( Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
The name of the port/place of destination given.
Rio Janerio ( Steel Steamer Report for Cambric, 13th March 1906 1906 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3403 ( Steel Steamer Report for Cambric, 13th March 1906 1906, Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Report of Survey for Repairs, &c for Cambric, 10th September 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Cambric, 6th March 1906 1906 )
Triple Compound Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906 )
Date in which construction of a vessel’s engines were completed.
1906 ( Report on Machinery for Cambric, 6th March 1906 1906, Form for Vessels of 100 Tons & Upwards for Cambric, 8th March 1906 1906, Report on Boilers for Cambric, 26th January 1906 1906, Report of Survey for Repairs, &c, of Engines & Boilers for Cambric, 12th September 1917 1917 )
The port in which a vessel is registered or permanently based.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.