Name of ship as recorded on the record
Bury ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
03/11/1910 ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
569 ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Location where a vessel’s survey was undertaken.
Hull ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Steel Steamer Report for Bury, 13th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Memo for Bury, 18th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
Grimsby ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946 )
London ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date )
Glasgow ( Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Is electric lighting fitted to the vessel?
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
The official record pronounced by the Committee
To be broken up ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Rotterdam ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
The port in which a vessel is registered or permanently based.
Grimsby ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Frederick Mortimer Barwick ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Reciprocating Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910 )
Triple Expansion ( Report on Machinery for Bury, January 1911 1911 )
Date in which construction of a vessel’s engines were completed.
The listed port to which a given vessel belongs.
Grimsby ( Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; +LMC 1,11 ( Steel Steamer Report for Bury, 13th January 1911 1911 )
See Minute on F E Report ( Report of Survey for Repairs for Bury, 7th January 1911 1911 )
+LMC 1,11 ( Report on Machinery for Bury, January 1911 1911 )
See Minute on F E Rpt on Machinery ( Report on Boilers for Bury, January 1911 1911 )
See Minute on FE Rpt ( Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911 )
+100A1; SS Gms No 3-6,23; SS Gms No 1-27 ( Report of Surveys for Freeboard for Bury, 7th July 1932 1932 )
+100A1 3,58; SS (Dr) 6,50; Imm 5,54; +LMC 5,4; BS M 3,58; SP 5,54; TS 3,57 CL ( Report of Total Loss & Casualty for Bury, 17th July 1958 1958 )
See Minute on Casualty Rpt ( Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
The name of the port/place of destination given.
Hamburg ( Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911 )
The year in which a vessel’s construction is completed.
1911 ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cantes Shipbuilding & Engineering Co Ltd ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Hull ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
A vessel’s means of propulsion.
Steam ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Is the steamer assisted by sail?
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Rotterdam ( Profile & Deck Plans for Bury, 16th August 1910 1910, Midship Section Plan for Bury, 16th August 1910 1910, Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th January 1911 1911, Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th December 1941 1941, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 4th May 1942 1942, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 20th April 1943 1943, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, January 1944 1944, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, 10th July 1946 1946, Memo for Bury, 18th July 1958 1958, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Bury, 16th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date, Copy of Freeboard Report for Bury, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HSBP ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910 )
The individual and/or organisation listed
Great Central Railway Co ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910 )
Great Central Railway ( Steel Steamer Report for Bury, 13th January 1911 1911, Report of Survey for Repairs for Bury, 7th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911 )
London & North Eastern Railway ( Report of Surveys for Freeboard for Bury, 7th July 1932 1932 )
British Transport Commission ( Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1634 ( Form for Vessels of 100 Tons & Upwards for Bury, 22nd December 1910 1910, Steel Steamer Report for Bury, 13th January 1911 1911, Report on Machinery for Bury, January 1911 1911 )
1518 ( Report of Survey for Repairs for Bury, 7th January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911 )
1686 ( Report of Surveys for Freeboard for Bury, 7th July 1932 1932, Report of Total Loss & Casualty for Bury, 17th July 1958 1958, Copy of Certificate of Survey for Bury, 27th June 1958 1958, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
Location of construction for a vessel’s engines.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Report for Bury, 13th January 1911 1911, Report on Machinery for Bury, January 1911 1911, Report on Boilers for Bury, January 1911 1911, Report on Electric Lighting Installation for Bury, 5th January 1911 1911, Report of Ship Surveys & Repairs for Bury, 2nd July 1958 1958 )
Gms ( Report of Survey for Repairs for Bury, 7th January 1911 1911, Report of Survey for Repairs of Engines & Boilers for Bury, 7th January 1911 1911, Report of Surveys for Freeboard for Bury, 7th July 1932 1932 )
Name of surveyor.
Recorded information related to a vessel’s movements.
Hull; Hamburg ( Steel Steamer Report for Bury, 13th January 1911 1911 )
Grimsby; Hamburg ( Report of Survey for Repairs for Bury, 7th January 1911 1911 )