Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Bucovina ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
09/01/1902 ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
65 ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Screw Steamer ( Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Location where a vessel’s survey was undertaken.
Trieste ( Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902 )
Dumbarton; Glasgow ( Report on Machinery for Bucovina, 2nd August 1901 1901 )
Dumbarton ( Plan of Main Boiler for Bucovina, 1st February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901 )
Sheffield ( Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902 )
London ( Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Name of surveyor.
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Bucovina, 2nd August 1901 1901, Report on Machinery for Bucovina, 13th March 1902 1902 )
Date in which construction of a vessel’s engines were completed.
1901 ( Report on Machinery for Bucovina, 2nd August 1901 1901, Report on Machinery for Bucovina, 13th March 1902 1902 )
The individual and/or organisation listed
Lloyd Austriaco ( Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902 )
Lloyd Triestino ( Report of Survey for Repairs, &c for Bucovina, Undated no date )
Recorded information related to a vessel’s movements.
Trieste; Mediterranean ( Steel Steamer Report for Bucovina, 12th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Report of Survey for Repairs, &c for Bucovina, Undated no date )
The year in which a vessel’s construction is completed.
1902 ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Lloyds Arsenal ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Trieste ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923 )
undefined ( Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Is the steamer assisted by sail?
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Bucovina, 10th July 1900 1900, Deck Plan for Bucovina, 18th July 1900 1900, Profile Plan for Bucovina, 17th July 1900 1900, Memo from Trieste regarding anchors for Bucovina, 16th September 1901 1901, Report on Machinery for Bucovina, 2nd August 1901 1901, Plan of Main Boiler for Bucovina, 1st February 1901 1901, Note relating to Plan of Steel Boiler for Bucovina, 7th February 1901 1901, Plan of Winch Boilers for Bucovina, 1st February 1901 1901, Extract form a letter dated 2nd January 1902 from The Surveyors, Trieste, regarding Bucovina 1902, Letter from R F Morton, to The Secretary, London, regarding Bucovina, 11th April 1902 1902, Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Copy of Letter from Secretary, to Societa di Navigazione & Vapore Lloyd Triesteino, Trieste, regarding Bucovina, 23rd November 1923 1923, Report of Survey for Repairs, &c for Bucovina, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report on Machinery for Bucovina, 2nd August 1901 1901 )
Tri ( Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902 )
Lon ( Report of Survey for Repairs, &c for Bucovina, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred for Completion ( Report on Machinery for Bucovina, 2nd August 1901 1901 )
+100A1; Steel Spar Dk; +LMC 3,02; FD ( Steel Steamer Report for Bucovina, 12th March 1902 1902 )
+LMC 3,02; FD ( Report on Machinery for Bucovina, 13th March 1902 1902 )
+100A1; Spar Dk; 3,02; +LMC 3,02 ( Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902 )
+100A1; Spar Dk; 5,23; SS Tri No 3,4,14; SS Tri No 2-21; +LMC 12,21; BS 10,22; TSS 23 CL ( Report of Survey for Repairs, &c for Bucovina, Undated no date )
Location of construction for a vessel’s engines.
Dumbarton ( Report on Machinery for Bucovina, 2nd August 1901 1901, Report on Machinery for Bucovina, 13th March 1902 1902 )
The listed port to which a given vessel belongs.
Trieste ( Steel Steamer Report for Bucovina, 12th March 1902 1902, Report on Machinery for Bucovina, 13th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902, Report on Electric Lighting Installation for Bucovina, 8th April 1902 1902, Report of Survey for Repairs, &c for Bucovina, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Lloyd Austriaco ( Steel Steamer Report for Bucovina, 12th March 1902 1902 )
The name of the port/place of destination given.
Mediterranean ( Steel Steamer Report for Bucovina, 12th March 1902 1902, Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A Marochins ( Report of Survey for Repairs, &c for Bucovina, 26th March 1902 1902 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.