Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

British Supremacy ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/07/1945 ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1284 ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Report on Boilers for British Supremacy, Undated no date )

London ( Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945 )

Glasgow ( Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945 )

Belfast; Glasgow ( Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date )

Falmouth ( Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961 )

River Fal; Falmouth ( Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

The year in which a vessel’s construction is completed.

Year of ship completion

1945 ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff Ltd ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Motor (internal combustion) ( Request for Special Survey for British Supremacy, 2nd December 1943 1943, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report on Boilers for British Supremacy, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to British Iron & Steel Corp for Breaking up ( Plan of Steel Decks for British Supremacy, 25th November 1943 1943, Framing Profile Plan for British Supremacy, 25th November 1943 1943, Sternframe & Rudder Plan for British Supremacy, 29th December 1943 1943, Request for Special Survey for British Supremacy, 2nd December 1943 1943, Plan of After End Framing for British Supremacy, 15th February 1944 1944, Midship Section Plan for British Supremacy, 17th December 1945 1945, Plan of Fore End Framing for British Supremacy, 21st April 1945 1945, Form for Vessels of 100 Tons & Upwards for British Supremacy, 7th December 1945 1945, Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Letter from W M Balfour, for the Belfast Surveyors, to the Secretary for Lloyd's Register regarding British Supremacy, 6th February 1946 1946, Extract from a letter received from Glasgow regarding British Supremacy, 28th January 1946 1946, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for British Supremacy, 22nd January 1946 1946, Steel Motorship Report for British Supremacy, 3rd January 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Supremacy, 21st January 1946 1946, Midship Section Plan for British Supremacy, 1st September 1948 1948, Extract from Falmouth regarding British Supremacy, 1st August 1961 1961, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class for British Supremacy, 25th July 1961 1961, Copy of a Certificate of Survey for British Supremacy, 17th July 1961 1961, Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961, Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961, Report of Surveys for Freeboard for British Supremacy, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for British Supremacy, Undated no date, Report on Boilers for British Supremacy, Undated no date, Memo regarding Generator Test Certificates for British Supremacy, 5th January no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Accompaying Machinery Report ( Report on Oil Engine Machinery for British Supremacy, 31st August 1945 1945, Report on Electrical Equipment for British Supremacy, 15th December 1945 1945, Report on Boilers for British Supremacy, Undated no date )

+LMC 12,45; Oil Eng; 2 DB 150 lb ( Report on Oil Engine Machinery for British Supremacy, 21st December 1945 1945 )

+100A1; Carrying Petroleum in Bulk; Longitudinal Framing at Bottom & at Deck; +LMC 12,45; Oil Eng; 2 DB 150 lb; Lloyds A & CP ( Steel Motorship Report for British Supremacy, 3rd January 1946 1946 )

+100A1 Oil Tanker 9,56; S S 5,54; Laid Up Surveys Overdue 5,58; +LMC CS 5,54; BS D 11,58; Sp 5,54; TS N 5,54; CL ( Report of Total Loss, Casualty, &c for British Supremacy, 2nd August 1961 1961 )

Deferred (Retain Laid Up Surveys Overdue 5,58) ( Report of Ship Surveys & Repairs for British Supremacy, 17th July 1961 1961 )

+100A1; Carrying Petroleum in Bulk ( Report of Surveys for Freeboard for British Supremacy, Undated no date )