Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

British Crown ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/11/1890 ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

235 ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891 )

Glasgow ( Ship Castings Form for British Crown, 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Ship Castings Form for British Crown, Undated no date )

London ( Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897 )

undefined ( Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Horizontal Multr With two Furnaces ( Report on Machinery for British Crown, 17th January 1891 1891 )

The year in which a vessel’s construction is completed.

Year of ship completion

1891 ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date )

1890 ( Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Steel Steamer Report for British Crown, 17th January 1891 1891, Ship Castings Form for British Crown, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Donkey Boiler for British Crown, 4th March 1890 1890, Plan of Main Boiler for British Crown, 21st February 1890 1890, Plan of Midship Section for British Crown, 20th December 1890 1890, Ship Castings Form for British Crown, 1890 1890, Test Room Sheet respecting Stern Frame for British Crown, carried out at The Steel Co of Scotland, Newton Works, 3rd April 1890 1890, Ship Castings Form for British Crown, 22nd July 1890 1890, Ship Forgings Form for British Crown, 8th March 1890 1890, Form of Particulars for Record of Material of Boilers for British Crown, 22nd January 1891 1891, Steel Steamer Report for British Crown, 17th January 1891 1891, Report on Machinery for British Crown, 17th January 1891 1891, Report of Survey for Repairs, &c for British Crown, 28th June 1891 1891, Report of Survey for Repairs, &c for British Crown, 13th April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 14th April 1892 1892, Report of Survey for Repairs, &c for British Crown, 10th November 1892 1892, Report of Survey for Repairs, &c for British Crown, 30th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 24th August 1893 1893, Report of Survey for Repairs, &c for British Crown, 13th April 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 4th April 1896 1896, Report of Survey for Repairs, &c for British Crown, 24th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for British Crown, 25th March 1897 1897, Report of Survey for Repairs, &c, for British Crown 20th September 1897, 1897, Report of Survey for Repairs, &c, of Engines & Boilers, for British Crown, 11th September 1897 1897, Test Room Sheet respecting Quadrant & Tiller for British Crown, for Harland & Wolff, Undated no date, Ship Castings Form for British Crown, Undated no date )

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.