Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
The year in which a vessel’s construction is completed.
1939 ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J L Thompson & Sons Ltd ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
The official record pronounced by the Committee
Sunk ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Recorded date for the vessel’s loss or disposal.
19/12/1942 ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Name of ship as recorded on the record
Bretwalda ( Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
The listed port to which a given vessel belongs.
Newcastle ( Steel Steamer Report for Bretwalda, 29th March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; With Freeboard; Lloyds A & Cp; +LMC 3,39 ( Steel Steamer Report for Bretwalda, 29th March 1939 1939 )
+LMC 3,39; 2 S B Spt; F D ( Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939 )
See Sld F E 32601 ( Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939 )
See Sld FE 32601 ( Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939 )
+100A1; With Freeboard 6,42; +LMC 3,39; CL 7,41 ( Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942 )
+100A1 with Fbd 6,42; +LMC 3,39; TS 7,41 CL ( Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
GRRV ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Location of construction for a vessel’s engines.
Sunderland ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939 )
The process of transferring a vessel to water, but not necessarily her completion.
04/02/1939 ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
591 ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
A vessel’s means of propulsion.
Steam ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
undefined ( Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942 )
Is the steamer assisted by sail?
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Request for Special Survey for Bretwalda, 31st August 1937 1937, Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Memo regarding modification to plan of main boilers for Bretwalda, 6th December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Boiler Endorsement, submitting amended plan of cylindrical boiler merits for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Boiler Endorsement for Bretwalda, 25th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Boiler Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938, Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Pumping Arrangement Endorsement for Bretwalda, 20th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Memo regarding plan of boiler pipe arrangement for Bretwalda, 30th September 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Superheater Endorsement for Bretwalda, 17th May 1938 1938, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Electrical Equipment Endorsement approving plans for Bretwalda subject to remaining works carried out to Surveyors' satisfaction, 7th November 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 4th April 1939 1939, Extract from freeboard verification of marking form received from Sunderland Surveyors dated 22nd March 1939 for Bretwalda, 5th April 1939 1939, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Bretwalda, 4th April 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939, Memo to Chief Ship Surveyor regarding Greenock Report on Damage Survey for Bretwalda, 23rd November 1942 1942, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
Location where a vessel’s survey was undertaken.
Newcastle-on-Tyne ( Letter from Newcastle-on-Tyne Surveyors per S R Davies to London Secretary, Lloyd's Register, regarding special survey & construction of machinery for Bretwalda, 10th September 1937 1937, Letter from J E Sellex, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding for consideration a print showing Combustion Chamber of Superheater proposed for Bretwalda, 10th May 1938 1938 )
Sunderland ( Plan of Half Midship Section for Bretwalda, 5th March 1937 1937, Plan of Profile for Royal Sceptre, 5th March 1937 1937, Decks Plan for Bretwalda, 5th March 1937 1937, Amended Plan of Boiler for Bretwalda, 19th November 1937 1937, Plan of Auxiliary Boiler for Bretwalda, 23rd November 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, forwarding amended plan showing proposed modifications to tubes in back of main boilers for constructional reasons for Bretwalda, 2nd December 1937 1937, Letter from L R Horne, Newcastle-on-Tyne Surveyor, to London Secretary, Lloyd's Register, acknowledging telegram approving, subject to conditions, amended plan for Bretwalda, 29th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, requesting wired approval in reference to letter sent submitting amended plan of Main Boilers for Bretwalda, 27th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boiler plan design for Bretwalda, 20th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the approval of a Auxiliary Boiler for Bretwalda, 24th November 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the boilers being fitted with the builders design of Combustion Chamber Superheaters for Bretwalda, 6th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, regarding the consideration of Committee proposed sizes of line shafting for Bretwalda, 7th October 1937 1937, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan of Tank Pipe Arrangement proposed for Bretwalda, 14th April 1938 1938, Letter from L R Horne, Sunderland Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee a plan Drawing of Boiler Pipe Arrangement proposed for Bretwalda, 28th September 1938 1938, Letter from G Auterson, Sunderland Electrical Engineer Surveyor, to Secretary of Lloyd's Register, London, regarding the committees wiring plans of electrical equipment proposed for Bretwalda, 4th November 1938 1938, Steel Steamer Report for Bretwalda, 29th March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Plan of Half Midship Section, as built, for Bretwalda, 13th April 1939 1939, Plan of Profile, as built, for Bretwalda, 13th April 1939 1939, Decks Plan, as built, for Bretwalda, 13th April 1939 1939, Letter from William C Millar, per Sunderland Surveyors, to London Secretary, Lloyd's Register, regarding plans & First Entry Report for Bretwalda, 15th April 1939 1939 )
London ( Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors, approving modifications made to plan of Bretwalda, 6th December 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding plan of boiler & acknowledging telegram of approval of amended plan for Bretwalda, 29th November 1937 1937, Copy of Telegram from London Committee, Lloyd's Register, to Sunderland Surveyors approving amended boiler plan for Bretwalda, 29th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed Cylindrical Auxiliary Boiler informing of approval for stated working pressurefor Bretwalda, 26th November 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning copy of plan of proposed cylindrical boiler informing of approval for stated working pressure, construction under survey & testing for Bretwalda, 13th October 1937 1937, Letter from London Secretary, Lloyd's Register, to Sunderland Surveyors regarding engine specifications for Bretwalda, 15th October 1937 1937, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors returning plan of proposed pumping arrangement in machinery space for Bretwalda, 21st April 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding plan of boiler pipe arrangement for Bretwalda, 1st October 1938 1938, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding a safety valve being fitted to each part of the superheaters for Bretwalda, 18th May 1938 1938, Letter from Secretary of Lloyd's Register, London, to Sunderland Surveyors regarding approval of plans once the installation be shown has been amended for Bretwalda, 7th November 1938 1938, Letter from London Secretary, Lloyd's Register to Sunderland Surveyors regarding proposal to build duplicate sister ships to Bretwalda, 31st March 1939 1939 )
Birmingham ( Purchase order for hot finished tubes manufactured by Bromford Tube Co Ltd, 26th March 1938 1938 )
Wallsend ( Plan of Arrangement of Combustion Chamber Superheater for Bretwalda, 9th May 1938 1938 )
Newcastle ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939 )
Greenock ( Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942 )
Type and configuration of the engine(s) supplied for a vessel.
N E Marine Engine Co Ltd ( Steam Engine Shafting Endorsement, for Bretwalda, 12th October 1937 1937 )
Triple Expansion ( Particulars of Line Shafting etc the North Eastern Marine Engineering Co Ltd for Bretwalda, 6th October 1937 1937, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939 )
Reciprocating Triple Expansion direct acting vertical ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Bretwalda, 29th March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939 )
Grk ( Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942 )
The individual and/or organisation listed
Hall Bros ( Steel Steamer Report for Bretwalda, 29th March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939 )
Hall Bros Steamship Co Ltd ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4906 ( Steel Steamer Report for Bretwalda, 29th March 1939 1939, Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Electrical Equipment for Bretwalda, 23rd March 1939 1939, Report fo Survey for Repairs, &c for Bretwalda, 4th November 1942 1942, Report of Total Loss, Casualty, &c for Bretwalda, Undated no date )
The port in which a vessel is registered or permanently based.
Newcastle ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Lewis Williams ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939 )
Date in which construction of a vessel’s engines were completed.
1939 ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 23rd March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939, Report on Boilers for Bretwalda, 25th March 1939 1939 )
1938 ( Report on Steam Reciprocating Engine Machiery for Bretwalda, 25th March 1939 1939 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.