Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Boveric ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Svarten ( Half Midship section Plan for Boveric, 19th October 1897 1897 )
The process of transferring a vessel to water, but not necessarily her completion.
30/12/1897 ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Unique identifier for a given ship, it is assigned by a builder.
412 ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Location where a vessel’s survey was undertaken.
Glasgow ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898 )
Greenock ( Half Midship Section Plan for Boveric, 19th October 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898 )
Newcastle ( Ship Forgings Form for Boveric, 10th June 1897 1897, Ship Castings Form for Boveric, 6th January 1898 1898 )
Motherwell; Greenock ( Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897 )
Leeds; Greenock ( Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897 )
Port Glasgow; Greenock ( Steel Steamer Report for Boveric, 1st March 1898 1898 )
Greenock; Port Glasgow ( Report on Machinery for Boveric, 25th February 1898 1898 )
Gothenburg ( Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933 )
London ( Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Does the vessel possess an auxiliary power source?
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Is electric lighting fitted to the vessel?
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Name of surveyor.
John C Craig ( Ship Forgings Form for Boveric, 10th June 1897 1897, Ship Castings Form for Boveric, 6th January 1898 1898 )
J W Dimmock ( Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897 )
Charles H Jordan ( Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898 )
Thomas J House ( Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898 )
Viggo Christian Bulow ( Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933 )
A vessel’s calculated maximum speed.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Steam Ship Boveric Co Ltd ( Report on Machinery for Boveric, 25th February 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898 )
The Steamship Boveric Co Ltd ( Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898 )
Rederi A-B Transatlantic ( Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932 )
A-B Lindholmen-Motala ( Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3987 ( Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898 )
4191 ( Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933 )
Date in which construction of a vessel’s engines were completed.
1898 ( Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898 )
1898/__/__ ( Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
William Weir Jnr ( Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898 )
Andrew Weir & Co ( Steel Steamer Report for Boveric, 1st March 1898 1898 )
G Carlsson ( Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898 )
Inverted Direct acting Triple Expansion ( Report on Machinery for Boveric, 25th February 1898 1898 )
Robey Vertical Engine ( Report on Electric Lighting Installation for Boveric, 25th February 1898 1898 )
Triple Expansion 3 Cylinder ( Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933 )
Recorded information related to a vessel’s movements.
Greenock; Cardiff; Freemantle ( Steel Steamer Report for Boveric, 1st March 1898 1898 )
Gothenburg ( Report of Total Loss, Casualty for Svarten, 8 June 1933 1933 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
The year in which a vessel’s construction is completed.
1897 ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898 )
1898 ( Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Russell & Co ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898 )
Port Glasgow ( Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
A vessel’s means of propulsion.
undefined ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897 )
Steam ( Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Is the steamer assisted by sail?
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Is machinery fitted at the aft of the vessel?
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Receipt for Material Manufactured by William Beardmore & Co for Boveric, 24th December 1896 1896, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 25th December 1896 1896, Half Midship section Plan for Boveric, 19th October 1897 1897, Half Midship Section Plan for Boveric, 19th October 1897 1897, Ship Forgings Form for Boveric, 10th June 1897 1897, Engine Forgings Form for Boveric, 20th August 1897 1897, Engine Forgings Form for Boveric, 27th December 1897 1897, Ship Forgings Form for Boveric, 25th October 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 2nd August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 15th September 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 21st January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 19th January 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 13th April 1897 1897, Receipt for Bars Manufactured by The Lanarkshire Steel Co Ltd for Boveric, 18th November 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 30th August 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 8th January 1897 1897, Receipt for Material Manufactured by William Beardmore & Co for Boveric, 7th January 1897 1897, Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 9th April 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 18th March 1897 1897, Consignment note for Furnaces, manufactured by The Leeds Forge Co Ltd for Boveric , 19th March 1897 1897, Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Letter from Donald Keith, Pro Surveyors to the Secretary of Lloyds Register, regarding electric lighting of Boveric, 4th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding damage done & subsequent classing of Boveric, 3rd March 1898 1898, Steel Steamer Report for Boveric, 1st March 1898 1898, Press copy of a Memo from surveyor, Thomas J House regarding a survey from builders Russell & co to ascertain the amount of damage due to a collision, sustained by the Steamer Boveric, 2nd March 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report on Electric Lighting Installation for Boveric, 25th February 1898 1898, Ship Castings Form for Boveric, 6th January 1898 1898, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of MacLachlan Patent Rudder for Boveric, 1897 1897, Plan of Winch Boiler for Boveric, 1897 1897, Thickness of Plating Form for Svarten, 23 December 1932 1932, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Copy of letter from the Secreatry, Lloyd's Register, to the Surveyors at Gothenburg regarding the breaking up of Svarten, 10 June 1933 1933, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 6 June 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the demolition of Svarten, 26 May 1933 1933, Copy of letter from the Clerk to the Classification Committee to the Surveyors at Gothenburg regarding the demolition of Svarten, 22 May 1933 1933, Letter from V Bulow, Surveyor at Gothenburg, to the Secretary, Lloyd's Register, regarding the sale for breaking up purposes of Svarten, 18 May 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee for Svarten, January 1933 1933 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location of construction for a vessel’s engines.
Greenock ( Report on Machinery for Boveric, 25th February 1898 1898, Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898, Report on Machinery for Boveric, 25th February 1898 1898, Report of Survey for Repairs for Svarten, 22 December 1932 1932, Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932, Report of Total Loss, Casualty for Svarten, 8 June 1933 1933 )
The port in which a vessel is registered or permanently based.
Glasgow ( Form for Vessels of 100 Tons & Upwards for Boveric, 17th February 1898 1898 )
Physical arrangement of a ship’s masts, sails and rigging.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel Spar dk; A & CP; +LMC 2,98; FD 1Dk (Stl) & Spar dk (Iron) & Deep Framing; Elec Light ( Steel Steamer Report for Boveric, 1st March 1898 1898 )
+LMC 2,98 FD; Elec Light ( Report on Machinery for Boveric, 25th February 1898 1898 )
Deferred for Complet 3rd No3 ( Report of Survey for Repairs for Svarten, 22 December 1932 1932 )
As now ( Report of Survey for Repairs of Engines and Boilers for Svarten, 23 December 1932 1932 )
+100A1 spar dk 7,32; SS Stm 2ns No3 10,20; SS Mmo No2 29; +LMC 8,29; BS 7;32; +NB(P) 7,17(a) 6,18 refitted 8,24 ( Report of Total Loss, Casualty for Svarten, 8 June 1933 1933 )
The name of the port/place of destination given.
Cardiff; Freemantle ( Steel Steamer Report for Boveric, 1st March 1898 1898 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.