Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Recorded information related to a vessel’s movements.

Voyage information

Selby; Fishing ( Steel Steamer Report for Bombay, 26th March 1907 1907 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Broad categories and subdivisions of vessels related to their purpose or function.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.