Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Benefactor ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Governor ( Plan of Half Midship Section for Governor, 8th August 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911 )
The process of transferring a vessel to water, but not necessarily her completion.
22/04/1912 ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
478 ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Plan of Displacement Scale for Benefactor, 29th November 1913 1913 )
Leeds ( Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911 )
Motherwell; Partick ( Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912 )
Motherwell; Glasgow ( Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
London; Trieste ( Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
The official record pronounced by the Committee
Broken up ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Recorded date for the vessel’s loss or disposal.
__/__/0000 ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Contemplated ( Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911 )
+100A1 ( Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912 )
+100A1 5,12; Lloyds A & CP; +LMC 5,12 ( Steel Steamer Report for Benefactor, 21st May 1912 1912 )
+LMC 5,12 ( Report on Machinery for Benefactor, 23rd May 1912 1912 )
See Minute on Accompanying Machinery Report ( Report on Boilers for Benefactor, 23rd May 1912 1912 )
+100A1; Class Contemplated ( Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912 )
+100A1; Fitted for Oil fuel 9,20 &c; SS No 3,9,24 ( Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932 )
+100A1 1,35; Fitted for Oil Fuel ( Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935 )
+100A1 2,34; SS Mdb No 3-9,24; SS Bkn No 2,33; +LMC; MS 7,33; BS 8,34; TS(CL) 4,33; Fitted for Oil fuel 9,20 FP above 150F ( Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
+100A1 1,35; Fitted for Oil Fuel 9,20; FP Above 150F; SS Mdb No 3-9,24; SS Bkn No 2-33; +LMC; MS 7,33; BS 8,34 ( Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936 )
The listed port to which a given vessel belongs.
Liverpool ( Steel Steamer Report for Benefactor, 21st May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
T & J Harrison ( Steel Steamer Report for Benefactor, 21st May 1912 1912, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
Godfrey Hammond Cole ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912 )
T J Harrison ( Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935 )
Recorded information related to a vessel’s movements.
Glasgow; Liverpool; Load ( Steel Steamer Report for Benefactor, 21st May 1912 1912 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Benefactor, 21st May 1912 1912 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HVWQ ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Compound Direct Acting Vertical Inverted Cylinder ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912 )
Triple Expansion ( Report on Machinery for Benefactor, 23rd May 1912 1912 )
Date in which construction of a vessel’s engines were completed.
1912 ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
The year in which a vessel’s construction is completed.
1912 ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
David & William Henderson & Co Ltd ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
A vessel’s means of propulsion.
Steam ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936 )
undefined ( Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Is the steamer assisted by sail?
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Breaking Up Purposes ( Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, enclosing letter giving particulars of freeboards provisionally assigned to Benefactor, 11th August 1911 1911, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified verification for Benefactor, 10th August 1911 1911, Freeboard Application for Certificate of Approval for Benefactor, 8th August 1911 1911, Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Plan of Profile for Benefactor, 8th August 1911 1911, Plan of Half Midship Section for Governor, 8th August 1911 1911, Plan of Auxiliary Boiler for Benefactor, 22nd September 1911 1911, Plan of Main Boiler for Benefactor, 22nd August 1911 1911, Amended Plan of Main Boiler for Benefactor, 28th August 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Boiler for Benefactor, 3rd November 1911 1911, Consignment note from The Leeds Forge Co Ltd to D & W Henderson & Co Ltd regarding Steel for Benefactor, 19th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 17th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 6th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 9th November 1911 1911, Receipt for Boiler Plates manufactured by David Colville & Sons Ltd for Benefactor, 13th November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 22nd November 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 12th December 1911 1911, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 7th December 1911 1911, Receipt for Boiler Plate manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 21st September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 12th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 15th September 1911 1911, Receipt for Boiler Plates manufactured The Steel Co of Scotland Ltd for Benefactor, 4th September 1911 1911, Profile & Deck Plan for Governor, 8th August 1911 1911, Memo to Chief Ship Surveyor regarding Glasgow First Entry Survey for Benefactor, 5th June 1912 1912, Telegram from Lloyd's Register, Glasgow, to Committee of Lloyd's Register, London, regarding fees paid & requesting Classification Certificates for Benefactor, 21st June 1912 1912, Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, informing of Official Number assigned in reference to freeboard certificates for Benefactor, 22nd May 1912 1912, Letter from P L Warlow, Secretary to the Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, enclosing letter regarding tonnage of Benefactor, 11th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Memo regarding Freeboard Report, submitting Surveyor should confirm under deck tonnage is Suez for Benefactor, 10th May 1912 1912, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval for Benefactor, 10th May 1912 1912, Freeboard Application for Certificate of Approval for Benefactor, 6th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Receipt for Bars manufactured by David Colville & Sons Ltd for Benefactor, 31st January 1912 1912, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing letter requesting Committee to reconsider fresh water freeboard assigned to Benefactor, 16th December 1913 1913, Letter from T & J Harrison, Liverpool, Managers, to Principal Surveyor of Lloyd's Register, Liverpool, requesting reconsideration of fresh water allowance & issue of new certificates of freeboard for Benefactor, 16th December 1913 1913, Plan of Displacement Scale for Benefactor, 29th November 1913 1913, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Letter from R Williamson, Liverpool Principal Surveyor, per W L Clark, to A Scott Esq of Lloyd's Register, London, enclosing verification of marking form in reference to amended fresh water freeboard assigned to Benefactor, 13th February 1914 1914, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to A Scott Esq of Lloyd's Register, London, enclosing letter regarding alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Letter from R R Ruthven, Liverpool Surveyor, to Secretary of Lloyd's Register, Liverpool, informing of alterations carried out to conform to International Load Line Convention for Benefactor, 29th July 1932 1932, Memo regarding Freeboard Report, submitting Freeboards on accompanying form merit approval subject to specified works for Benefactor, 6th June 1932 1932, Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932, Letter from D M Keith, Secretary to the Liverpool Committee of Lloyd's Register, to Secretary of Lloyd's Register, London, requesting First Entry Report, Plans & New Convention Freeboard particulars for Surveyors' guidance for Benefactor, 8th April 1932 1932, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Question & Answer Memo between London & Trieste Office regarding demolition of Benefactor, 10th October 1935 1935, Memo for Chief Ship Surveyor with their annotations regarding Liverpool Report on Docking Survey for Benefactor, 6th February 1935 1935, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936, Particulars for Freeboard Certificates for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Memo regarding Freeboard Report on Convention Freeboards for Sister Ships for Benefactor, Undated no date, Freeboard & Draught Document for Benefactor, Undated no date, Document showing calculations for Benefactor, Undated no date, Freeboard Particulars form for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date, Document showing Calculations for Benefactor, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report of Surveys for Freeboard-Steam Ships for Benefactor, 10th August 1911 1911, Steel Steamer Report for Benefactor, 21st May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912 )
Liv ( Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
Name of surveyor.
Arthur Scullard ( Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 21st September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 4th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 7th October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 30th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 2nd October 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 27th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 28th September 1911 1911, Receipt for materials manufactured by William Beardmore & Co Ltd for Benefactor, 26th September 1911 1911 )
George Nicol ( Steel Steamer Report for Benefactor, 21st May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912, Letter from George Nicol, Glasgow Surveyor, to Secretary of Lloyd's Register, Glasgow, regarding Builders stating under deck tonnage in Suez Canal Tonnage in reference to Freeboard Report for Benefactor, 11th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912 )
Harry Clarke ( Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912 )
The individual and/or organisation listed
The Charente Steamship Co Ltd ( Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932 )
T & J Harrison ( Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 15th May 1912 1912 )
Charente Steamship Co Ltd ( Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
Thomas & James Harrison ( Freeboard Application for Certificate of Approval for Benefactor, 2nd June 1932 1932 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
The name of the port/place of destination given.
Liverpool; Load ( Steel Steamer Report for Benefactor, 21st May 1912 1912 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5511 ( Steel Steamer Report for Benefactor, 21st May 1912 1912, Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912 )
5517 ( Report of Surveys for Freeboard for Benefactor, 15th April 1932 1932, Report of Survey for Repairs, &c for Benefactor, 30th January 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935, Report of Total Loss, Casualty, &c for Benefactor, 27th April 1936 1936 )
The port in which a vessel is registered or permanently based.
Liverpool ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912, Report of Surveys for Freeboard-Steam Ships Verification for Benefactor, 8th May 1912 1912, Freeboard Verification Form for Steamers for Benefactor, 13th February 1914 1914, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Benefactor, 29th July 1932 1932 )
Location of construction for a vessel’s engines.
Partick ( Form for Vessels of 100 Tons & Upwards for Benefactor, 24th May 1912 1912 )
Glasgow ( Report on Machinery for Benefactor, 23rd May 1912 1912, Report on Boilers for Benefactor, 23rd May 1912 1912, Report of Survey for Repairs, &c, of Engines & Boilers for Benefactor, 30th January 1935 1935 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.