Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Barcelona ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
07/05/1895 ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
219 ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Motherwell; Dundee ( Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895 )
A vessel’s means of propulsion.
Steam ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
undefined ( Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895 )
Is the steamer assisted by sail?
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
The listed port to which a given vessel belongs.
Cadiz ( Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Jaun B Ybargaray ( Steel Steamer Report for Barcelona, 7th June 1895 1895 )
J B Ybargaray ( Report on Machinery for Barcelona, 7th June 1895 1895 )
Recorded information related to a vessel’s movements.
Glasgow; Philippine Islands via Liverpool ( Steel Steamer Report for Barcelona, 7th June 1895 1895 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Barcelona, 7th June 1895 1895 )
Name of surveyor.
James Mollison; Charles E Stromeyer ( Report on Machinery for Barcelona, 7th June 1895 1895 )
William C Hamilton ( Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895 )
Frank Cook ( Ship Forgings Form for Barcelona, 3rd April 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895 )
Location of construction for a vessel’s engines.
Glasgow ( Report on Machinery for Barcelona, 7th June 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895 )
The year in which a vessel’s construction is completed.
1895 ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C Connell & Co ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895 )
Screw Steamer ( Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Masts for Barcelona, 28th January 1895 1895 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Is electric lighting fitted to the vessel?
No ( Spar & Main Deck Plating Plan for Barcelona, 7th December 1894 1894, Plan of Steel Boilers for Barcelona, 22nd November 1894 1894, Profile Plan for Barcelona, 23rd November 1894 1894, Plan of Sections Showing Line of Quarter Pillars for Barcelona, 22nd December 1894 1894, Plan of Pumping Arrangement for Barcelona, 29th December 1894 1894, Plan of Steel Donkey Boiler for Barcelona, 10th December 1894 1894, Half Midship Section Plan for Barcelona, 23rd November 1894 1894, Plan of Steel Boiler for Barcelona, 29th November 1894 1894, Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Advice Note from David Colville & Sons, to Brown & Tawse, regarding Angles for Barcelona, 3rd June 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Barcelona, 28th May 1895 1895, Ship Forgings Form for Barcelona, 15th February 1895 1895, Ship Forgings Form for Barcelona, 3rd April 1895 1895, Press copy of advice note from R Farrell & Son to Bolckow, Vaughan & Co Ltd, regarding materials for Barcelona, 29th May 1895 1895, Engine Forgings Form for Barcelona, 11th March 1895 1895, Plan of Masts for Barcelona, 28th January 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895, Report on Electric Lighting Installation for Barcelona, Undated no date, Supplementary Report on Machinery for Barcelona, Undated no date, Report on Machinery for Barcelona, Undated no date )
The individual and/or organisation listed
Pinillos Saenz & Co ( Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; A & Cp; +LMC 6,95; 1 Dk Steel ( Steel Steamer Report for Barcelona, 7th June 1895 1895 )
+LMC 6,95 ( Report on Machinery for Barcelona, 7th June 1895 1895 )
The name of the port/place of destination given.
Philippine Islands ( Steel Steamer Report for Barcelona, 7th June 1895 1895 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4218 ( Steel Steamer Report for Barcelona, 7th June 1895 1895, Report on Machinery for Barcelona, 7th June 1895 1895 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting ( Report on Machinery for Barcelona, 7th June 1895 1895 )
Two poled dynamo compound wound with ring armature coupled direct to a vert ( Report on Electric Lighting Installation for Barcelona, Undated no date )
Date in which construction of a vessel’s engines were completed.
1895 ( Report on Machinery for Barcelona, 7th June 1895 1895 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.