Name of ship as recorded on the record
Barbara ( Report on Machinery for Barbara, 23rd December 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897 )
The process of transferring a vessel to water, but not necessarily her completion.
05/12/1896 ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
229 ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl ( Report on Machinery for Barbara, 23rd December 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897 )
The individual and/or organisation listed
J E Guthe & Co ( Report on Machinery for Barbara, 23rd December 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897 )
Julius Ernest Guthe ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
Name of surveyor.
W J Smith ( Report on Machinery for Barbara, 23rd December 1896 1896 )
Hugh Cameron ( Ship Forgings Form for Barbara, 31st December 1896 1896 )
John C Craig ( Engine Forgings Form for Barbara, 20th July 1896 1896 )
Charles Fowling ( Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 2,97 ( Report on Machinery for Barbara, 23rd December 1896 1896 )
+100A1 Steel; A & Cp Spar DK; +LMC 2.97 With Freebd S 6 3; Spar Dk (Stl) 2 trb & Web Frames ( Steel Steamer Report for Barbara, 17th February 1897 1897 )
A vessel’s means of propulsion.
Steam ( Report on Machinery for Barbara, 23rd December 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897 )
undefined ( Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Is the steamer assisted by sail?
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Barbara, 23rd December 1896 1896 )
Tri-compound Inverted direct Acting ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
Date in which construction of a vessel’s engines were completed.
1896 ( Report on Machinery for Barbara, 23rd December 1896 1896 )
1897 ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
Is machinery fitted at the aft of the vessel?
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
1896 ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Profile Plan for Barbara, 21st April 1896 1896 )
1897 ( Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
0000 ( Note relating to Plan of Steel boiler for Barbara, Undated no date )
The name of the port/place of destination given.
Cardiff ( Steel Steamer Report for Barbara, 17th February 1897 1897 )
The port in which a vessel is registered or permanently based.
Hartlepool ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
The year in which a vessel’s construction is completed.
1897 ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
1896 ( Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness, Withy & Co ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Furness Withy & Co ( Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897 )
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
The listed port to which a given vessel belongs.
West Hartlepool ( Report on Machinery for Barbara, 23rd December 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
E Mahn ( Report on Machinery for Barbara, 23rd December 1896 1896 )
Ernest Mahn ( Steel Steamer Report for Barbara, 17th February 1897 1897 )
Ernest Carl Louis Heinrich Mann ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
Location where a vessel’s survey was undertaken.
Sunderland; Hartlepool ( Report on Machinery for Barbara, 23rd December 1896 1896 )
Newcastle Upon Tyne; Sunderland ( Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896 )
Stockton on Tees; Sunderland ( Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896 )
West Hartlepool ( Half Midship Section Plan for Barbara, 8th May 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897 )
Sunderland ( Ship Forgings Form for Barbara, 31st December 1896 1896 )
Newcastle ( Engine Forgings Form for Barbara, 20th July 1896 1896 )
West Hartlepool; Hartlepool ( Steel Steamer Report for Barbara, 17th February 1897 1897 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Screw Steamer ( Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Sunderland ( Report on Machinery for Barbara, 23rd December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
Is electric lighting fitted to the vessel?
No ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Plan of Boiler for Barbara, 1896 1896, Ship Forgings Form for Barbara, 31st December 1896 1896, Engine Forgings Form for Barbara, 20th July 1896 1896, Profile Plan for Barbara, 21st April 1896 1896, Steel Steamer Report for Barbara, 17th February 1897 1897, Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897, Letter from Alexander Douglas to the Secretary of Lloyds Register, regarding plans of Barbara for the case of a duplicate vessel, 20th February 1897 1897, Form from Alexander Douglas to the Secretary of Lloyd's Register forwarding Midship Section for Barbara, 16th February 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding classification survey for Barbara, 18th February 1897 1897, Note relating to Plan of Steel boiler for Barbara, Undated no date )
A vessel’s calculated maximum speed.
1896 ( Report on Machinery for Barbara, 23rd December 1896 1896, Receipt for Steel Bars manufactured by Palmers Shipbuilding & Iron Co Ltd for Barbara, 30th July 1896 1896, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Barbara, 30th May 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 11th June 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 16th July 1896 1896, Receipt for materials manufactured The Stockton Malleable Iron Co Ltd for Barbara, 17th June 1896 1896, Half Midship Section Plan for Barbara, 8th May 1896 1896, Profile Plan for Barbara, 21st April 1896 1896 )
, 1896 ( Plan of Boiler for Barbara, 1896 1896 )
1897 ( Freeboard Verification Form for Steamers for Barbara, 4th February 1897 1897, Form for Vessels of 100 Tons & Upwards for Barbara, 10th February 1897 1897 )
ated ( Note relating to Plan of Steel boiler for Barbara, Undated no date )
Recorded information related to a vessel’s movements.
West Hartlepool; Cardiff ( Steel Steamer Report for Barbara, 17th February 1897 1897 )
Physical arrangement of a ship’s masts, sails and rigging.