Name of ship as recorded on the record
Baradine ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
27/11/1920 ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
583 ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Location where a vessel’s survey was undertaken.
Greenock ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921 )
Belfast ( Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921 )
London ( Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Is electric lighting fitted to the vessel?
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Steamer Report for Baradine, 31st August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921 )
Lon ( Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
The individual and/or organisation listed
The Peninsular & Oriental Steam Navigation Co Ltd ( Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shade dk; +LMC 8,21; FD CL; Lloyds A&C P ( Steel Steamer Report for Baradine, 31st August 1921 1921 )
+LMC 8,21; FD; CL ( Report on Machinery for Baradine, 24th August 1921 1921 )
Elec Light ( Report on Electric Lighting Installation for Baradine, 15th August 1921 1921 )
Deferred for BS &c ( Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
The name of the port/place of destination given.
London ( Steel Steamer Report for Baradine, 31st August 1921 1921 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
13144 ( Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921 )
13072 ( Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
The port in which a vessel is registered or permanently based.
Belfast ( Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Compound direct acting Vertical Inverted ( Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921 )
Twin Screw Quadruple Expansion ( Report on Machinery for Baradine, 24th August 1921 1921 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1921 ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
A vessel’s means of propulsion.
Steam ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
undefined ( Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Copy of Telegram for Baradine, Undated no date )
Is the steamer assisted by sail?
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile & Deck Plan for Baradine, 13th December 1918 1918, Midship Section Plan for Baradine, 2nd December 1918 1918, Plan of Double Ended Main Boiler for Baradine, 27th May 1919 1919, Plan of Single Ended Main Boiler for Baradine, 27th May 1919 1919, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 19th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 15th September 1921 1921, Letter from J D Mares, Lloyd's Register, Greenock, to the Secretary, London, regarding Baradine, 13th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Greenock, regarding Baradine, 13th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 13th September 1921 1921, Letter from S O Kendall, Lloyd's Register, Belfast, to the Secretary, London, regarding Baradine, 10th September 1921 1921, Copy of Letter from Secretary, Lloyd's Register, London, to the Surveyors, Belfast, regarding Baradine, 7th September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 7th September 1921 1921, Steel Steamer Report for Baradine, 31st August 1921 1921, Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Baradine, 9th August 1933 1933, Memo for Baradine, 22nd May 1933 1933, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933, Copy of Telegram for Baradine, Undated no date )
The listed port to which a given vessel belongs.
Belfast ( Steel Steamer Report for Baradine, 31st August 1921 1921, Report on Machinery for Baradine, 24th August 1921 1921, Report on Boilers for Baradine, 24th August 1921 1921, Report on Electric Lighting Installation for Baradine, 15th August 1921 1921, Report of Survey for Repairs, &c for Baradine, 31st July 1933 1933 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G Lanphier ( Steel Steamer Report for Baradine, 31st August 1921 1921 )
Recorded information related to a vessel’s movements.
Belfast; London ( Steel Steamer Report for Baradine, 31st August 1921 1921 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KJLT ( Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Frank Ritchie ( Form for Vessels of 100 Tons & Upwards for Baradine, 12th August 1921 1921 )
Location of construction for a vessel’s engines.
Have you noticed missing or incorrect data or images for this ship?