Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Ban Hong Liong ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Ban Hong Leong ( Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/09/1906 ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

32 ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Montrose ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906 )

Hull ( Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date )

Dundee ( Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906 )

Montrose; Dundee ( Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906 )

London ( Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Stockton; Middlesbrough on Tees ( Report on Boilers for Ban Hong Liong, 17th October 1906 1906 )

Barry ( Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906 )

Singapore ( Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Name of surveyor.

Surveyor

William Morrison ( Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906 )

Charles H Jordan ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906 )

William Morrison; Allison B Wilson ( Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906 )

James Barclay ( Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The year in which a vessel’s construction is completed.

Year of ship completion

1906 ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Montrose Shipbuilding Co ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Montrose ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

undefined ( Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Profile & Deck Plans for Ban Hong Liong, 1905 1905, Plan of Midship Section for Ban Hong Liong, 1905 1905, Plan of Vertical Steel Donkey Boiler with Three Cross Tube for Ban Hong Liong, 1905 1905, Amended Plan of Steel Boiler for Ban Hong Liong, 8th December 1905 1905, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding classification certificate for Ban Hong Liong, 26th October 1906 1906, Particulars for Record in Lloyd's Register for Ban Hong Liong, 8th March 1906 1906, Letter from William Morrison, Lloyd's Surveyor, to the Committee of Lloyd's Register, asking to confirm receipt of a telegram regarding Tonnage details for Ban Hong Liong, 23rd October 1906 1906, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ban Hong Liong, 23rd October 1906 1906, Telegram from Dundee surveyor, Morrison to the Committee, regarding fees & expenses received for for Ban Hong Liong, 23rd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding ownership of Ban Hong Liong, 22nd October 1906 1906, Letter from William Morrison, Dundee Surveyor, to the Secretary for Lloyd's Register, London, regarding tonnages & certificates for Ban Hong Liong, 22nd October 1906 1906, Letter from Joseph Constant, for N Constant, to the Hull Surveyors regarding cement ceiling for Ban Hong Liong, 13th October 1906 1906, Telegram regarding report received minus tonnages for Ban Hong Liong, 22nd October 1906 1906, Letter from John Fletcher, The Montrose Shipbuilding Co, to Lloyd's Register, London, requesting certificates for Ban Hong Liong, 18th October 1906 1906, Copy of Telegram regarding certificates for Ban Hong Liong, 20th October 1906 1906, Letter from the Secretary for Lloyd's Register to the Hull Surveyors requesting first entry reports for Ban Hong Liong, 19th October 1906 1906, Steel Steamer Report for Ban Hong Liong, 17th October 1906 1906, Report on Machinery for Ban Hong Liong, 17th October 1906 1906, Form for Vessels of 100 Tons & Upwards for Ban Hong Liong, 15th October 1906 1906, Report on Boilers for Ban Hong Liong, 17th October 1906 1906, Letter from Andrew Couper, Barry Surveyor, to the Secretary for Lloyd's Register, London, regarding electric light installation for Ban Hong Liong, 29th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding report on Electric Light Installation for Ban Hong Liong, 27th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Secretary for Lloyd's Register, London, regarding electric lighting for Ban Hong Liong, 19th October 1906 1906, Letter from James Barclay, Hull Surveyor, to the Barry Surveyors regarding Electric Light Installation fitted on Ban Hong Liong, 18th October 1906 1906, Letter from the Secretary for Lloyd's Register, London, to The Heap Engineering Moh Steam Ship Co Ltd, Singapore, regarding the withdrawal of class for Ban Hong Liong, 31st March 1932 1932, Memo regarding classification of Ban Hong Liong, 31st March 1932 1932, Memo for the Chief Surveyors with their annotations regarding the 2nd No 2 survey partly held for Ban Hong Liong, 26th March 1932 1932, Letter from John T Findlay, Singapore Surveyor, to the Secretary for Lloyd's Register, London, enclosing a letter from the owners regarding Ban Hong Liong, 24th February 1932 1932, Letter from the Director of Heap Engineering Moh Steam Ship Co Ltd to the Singapore Surveyors regarding the withdrawal of class for Ban Hong Liong, 24th February 1932 1932, Telegram regarding machinery fees paid for Ban Hong Liong, Undated no date, Telegram regarding dimensions & tonnage for Ban Hong Liong, Undated no date, Report on Electric Lighting Installation for Ban Hong Liong, 17th October no date, Report of Survey for Repairs, &c for Ban Stong Liong, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.