Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Avalon ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
16/06/1888 ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
__/07/1888 ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
Unique identifier for a given ship, it is assigned by a builder.
102 ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Location where a vessel’s survey was undertaken.
Newcastle on Tyne ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888 )
Motherwell; Stockton on Tees ( Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888 )
Glasgow ( Tests of Boiler Steel for Avalon, 7th January 1887 1887, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
Stockton ( Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888 )
West Hartlepool ( Tests of Boiler Steel for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Newcastle ( Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888 )
Stockton; Newcastle ( Report on Machinery for Avalon, 26th June 1888 1888 )
London ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
undefined ( Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Is the steamer assisted by sail?
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888 )
Lon ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
Gls ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
The individual and/or organisation listed
English American Steamship Co Ltd ( Steel Ship Report for Avalon, 19th July 1888 1888 )
English American Shipping Co Ltd ( Report on Machinery for Avalon, 26th June 1888 1888 )
Eng & Am Shipping Co Ltd ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890 )
English & American Shipping Co ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897 )
English & American Ship Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
English & American Shipping Co Ltd ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; Iron to Steam Iron; 1Dk Stl & Web Frames; Well Dk; +LMC 6/88; LA & CP ( Steel Ship Report for Avalon, 19th July 1888 1888 )
+LMC 6/88 ( Report on Machinery for Avalon, 26th June 1888 1888 )
Deferred ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890 )
+100A1 As No 2-97; +LMC 3,97 ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897 )
+LMC 3,97 ( Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
+100A1; BS 5,98 ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898 )
BS 5,98 ( Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
The name of the port/place of destination given.
Savona ( Steel Ship Report for Avalon, 19th July 1888 1888 )
America ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
Azores ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2083 ( Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Triple Expansion 3 Cylinders & 3 Cranks ( Report on Machinery for Avalon, 26th June 1888 1888 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1888 ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C S Swan & Hunter ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Screw Steamer ( Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Avalon, 9th December 1887 1887, Profile Plan for Avalon, 13th December 1887 1887, Plan of Strengthening of Deck in Way of Long Hatches for Avalon, 15th December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Tests of Boiler Steel for Avalon, 7th January 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Letter from W G Slater, pro The Surveyors, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 4th October 1888 1888, Plan Shewing Distribution of Strength on Bridge Sides for Avalon, 28th February 1888 1888, Plan of Pumping Arrangement for Avalon, 7th March 1888 1888, Plan of Steel Masts for Avalon, 16th March 1888 1888, Plan of Plate Strakes for Avalon, 25th May 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 14th February 1888 1888, Tests of Boiler Steel for Avalon, 15th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 25th January 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 30th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888, Tests of Boiler Steel for Avalon, 4th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Cover Note for Report for Avalon, 8th August 1888 1888, Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888, Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898, Tests of Boiler Steel for Avalon, Undated no date, Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
Name of surveyor.
Henry Hand ( Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plate for Avalon, 31st December 1887 1887, Advice Note from David Colville & Sons, to Blair & Co Ltd, regarding Plates for Avalon, 29th December 1887 1887, Tests of Boiler Steel for Avalon, 4th January 1888 1888 )
Thomas J Dodd; Henry Hand ( Tests of Boiler Steel for Avalon, 7th January 1887 1887 )
Henri Wilkinson ( Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 22nd December 1887 1887, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888, Tests of Boiler Steel for Avalon, 9th January 1888 1888 )
Herbert W Dove ( Tests of Boiler Steel for Avalon, 15th February 1888 1888, Tests of Boiler Steel for Avalon, 16th February 1888 1888, Tests of Boiler Steel for Avalon, 26th January 1888 1888, Tests of Boiler Steel for Avalon, 31st January 1888 1888 )
William R Austin ( Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 6th January 1888 1888, Press Copy of Advice Note to Blair & Co Ltd, regarding Steel Plates for Avalon, 4th January 1888 1888, Tests of Boiler Steel for Avalon, Undated no date )
Henry J Boolds ( Letter from Henry J Boolds, for Self & Colleagues, to The Secretary, Lloyd\'s Register, London, regarding Avalon, 8th August 1888 1888 )
James Sibun ( Letter from James Sibun, to The Secretary, Lloyd\'s Register, regarding Avalon, 11th August 1888 1888, Form of Particulars for Record of Iron Decks, &c, in Lloyd\'s Register for Avalon, August 1888 1888, Form of Particulars for Record of Double Bottoms, &c, in Lloyd\'s Register for Avalon, 7th August 1888 1888, Steel Ship Report for Avalon, 19th July 1888 1888 )
J E Stoddart; Richard Hirst ( Report on Machinery for Avalon, 26th June 1888 1888 )
George P Cooper ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890 )
Henry Hand; Thomas J Dodd ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897 )
William C Hamilton ( Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
Edward John Tierney ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898 )
J E Stoddart ( Form of Particulars for Record of Material of Boilers for Avalon, Undated no date )
The listed port to which a given vessel belongs.
London ( Steel Ship Report for Avalon, 19th July 1888 1888, Report on Machinery for Avalon, 26th June 1888 1888, Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890, Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897, Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Towil ( Steel Ship Report for Avalon, 19th July 1888 1888 )
E Cox ( Report of Survey for Repairs, &c for Avalon, 22nd July 1890 1890 )
Boulter ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
Orchard ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898 )
Bonttor ( Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 12th May 1898 1898 )
Recorded information related to a vessel’s movements.
Newcastle; Savona ( Steel Ship Report for Avalon, 19th July 1888 1888 )
Glasgow; America ( Report of Survey for Repairs, &c for Avalon, 1st March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Avalon, 3rd March 1897 1897 )
London; Boness; Azores ( Report of Survey for Repairs, &c for Avalon, 17th May 1898 1898 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Ship Report for Avalon, 19th July 1888 1888 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
G E Bowring ( Report on Machinery for Avalon, 26th June 1888 1888 )
Location of construction for a vessel’s engines.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.