Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Aurora ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/06/1863 ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Wood ( Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880 )

Lon ( Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

The individual and/or organisation listed

Ship owner

Pickernell Bros ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864 )

Pickernel Bros ( Annual Surveys Report for Aurora, 18th January 1866 1866 )

London Steam Ship Co Ltd ( Report of Survey for Repairs for Aurora, 29th August 1867 1867, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Annual Surveys Report for Aurora, 20th June 1874 1874, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877 )

London Steamship Co Ltd ( Annual Surveys Report for Aurora, 26th June 1868 1868 )

London Steam ship & Co Ltd ( Report of Survey for Repairs for Aurora, 22nd March 1872 1872 )

London Steam Shipping Co Ltd ( Report of Survey for Repairs for Aurora, 5th May 1873 1873 )

London Steamship Co ( Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883 )

London Steam Ship Co ( Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883 )

Eurico Zenoglio ( Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

Name of surveyor.

Surveyor

William C Davey ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864 )

Richard J Reed ( Annual Surveys Report for Aurora, 18th January 1866 1866 )

Thomas H Eastlake ( Report of Survey for Repairs for Aurora, 25th June 1870 1870 )

Benjamin Martell ( Report of Survey for Repairs for Aurora, 22nd March 1872 1872 )

William H Turner ( Report of Survey for Repairs for Aurora, 5th May 1873 1873 )

Thomas W Blaxell ( Annual Surveys Report for Aurora, 20th June 1874 1874, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876 )

Senhouse Martindale ( Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883 )

George W Manuel ( Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876 )

James T Milton ( Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879 )

George E Wilkinson ( Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882 )

Charles E Stromeyer ( Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883 )

Charles H Jordan ( Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

698 ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 5th May 1873 1873 )

711 ( Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

446 ( Engineer's Certificate for Aurora, 21st June 1872 1872, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876 )

646 ( Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877 )

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Physical arrangement of a ship’s masts, sails and rigging.

The year in which a vessel’s construction is completed.

Year of ship completion

1863 ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Palmer Bros & Co ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 22nd March 1872 1872 )

South Shields; Newcastle ( Report of Survey for Repairs for Aurora, 18th July 1864 1864 )

London ( Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

Newcastle on Tyne ( Engineer's Certificate for Aurora, 21st June 1872 1872 )

A vessel’s means of propulsion.

Propulsion

undefined ( Midship Section Plan for Aurora, 8th December 1862 1862, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Sail ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878 )

Steam ( Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Midship Section Plan for Aurora, 8th December 1862 1862, Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Engineer's Certificate for Aurora, 21st June 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886, Cover Note for Report for Aurora, Sent to Genoa, 5th February 1916 1916 )

The listed port to which a given vessel belongs.

Port belonging to

London ( Iron Ships Report for Aurora, 31st July 1863 1863, Report of Survey for Repairs for Aurora, 18th July 1864 1864, Annual Surveys Report for Aurora, 18th January 1866 1866, Report of Survey for Repairs for Aurora, 29th August 1867 1867, Annual Surveys Report for Aurora, 26th June 1868 1868, Report of Survey for Repairs for Aurora, 25th June 1870 1870, Report of Survey for Repairs for Aurora, 22nd March 1872 1872, Report of Survey for Repairs for Aurora, 5th May 1873 1873, Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876, Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876, Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880, Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880, Annual Surveys Report for Aurora, 2nd August 1881 1881, Report of Survey for Repairs of Engines & Boilers for Aurora, 5th August 1881 1881, Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882, Report of Survey for Repairs of Engines & Boilers for Aurora, 29th June 1882 1882, Annual Surveys Report for Aurora, 8th August 1883 1883, Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883, Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

undefined ( Engineer's Certificate for Aurora, 21st June 1872 1872 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 9 Years ( Iron Ships Report for Aurora, 31st July 1863 1863 )

9A1; Record Damage Repair ( Report of Survey for Repairs for Aurora, 18th July 1864 1864 )

9A1 ( Annual Surveys Report for Aurora, 18th January 1866 1866, Annual Surveys Report for Aurora, 26th June 1868 1868 )

9A1; (ts 67) ( Report of Survey for Repairs for Aurora, 29th August 1867 1867 )

9 A1; TS 70 ( Report of Survey for Repairs for Aurora, 25th June 1870 1870 )

95A1; S S no 3-72; MC 72 ( Report of Survey for Repairs for Aurora, 22nd March 1872 1872 )

90A1 ( Report of Survey for Repairs for Aurora, 5th May 1873 1873 )

95A1 ( Annual Surveys Report for Aurora, 20th June 1874 1874, Annual Surveys Report for Aurora, 7th June 1875 1875, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th August 1877 1877, Report of Survey for Repairs, &c for Aurora, 20th March 1878 1878, Report of Survey for Repairs, &c for Aurora, 4th July 1879 1879, Report of Survey for Repairs of Engines & Boilers for Aurora, 7th July 1879 1879, Annual Surveys Report for Aurora, 8th August 1883 1883 )

95A1; 2Y Double Bottom; S S no 1-76; Lloyds Mc ( Report of Survey for Repairs, &c for Aurora, 3rd August 1876 1876 )

95 A1 ( Report of Survey for Repairs of Engines & Boilers for Aurora, 11th August 1876 1876 )

95A1; Lloyds MC 77 ( Report of Survey for Repairs, &c for Aurora, 7th August 1877 1877 )

95A1; S S no2-80; Lloyds MC 7,80 ( Report of Survey for Repairs, &c for Aurora, 21st July 1880 1880 )

95A1; Lloyds MC 8,77 ( Report of Survey for Repairs of Engines & Boilers for Aurora, 13th July 1880 1880 )

95A1; BS 8 81 ( Annual Surveys Report for Aurora, 2nd August 1881 1881 )

95A1; BS 7,82 ( Report of Survey for Repairs, &c; Repairs for Aurora, 19th July 1882 1882 )

BS 7,83 ( Report of Survey for Repairs of Engines & Boilers for Aurora, 31st July 1883 1883 )

Deferred ( Report of Survey for Repairs, &c for Aurora, 27th January 1886 1886 )

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Direct Acting Surface Condenser Compound ( Engineer's Certificate for Aurora, 21st June 1872 1872 )

Two Inverted Cylinders Compound ( Engineer Surveyor's Report on Machinery for Aurora, 11th August 1876 1876 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.