Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Laura ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916 )
Aruba ( Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
06/01/1916 ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
275 ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Location where a vessel’s survey was undertaken.
Annan Scotland ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913 )
Glasgow ( Request for Special Survey of Boiler for Laura, 12th January 1915 1915 )
Annan; Glasgow ( Report on Boilers for Folmina, 26th March 1915 1915 )
Rotterdam ( Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916 )
London ( Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916 )
Goole; Hull ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941 )
A vessel’s means of propulsion.
undefined ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941 )
Steam ( Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed & Sunk ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The individual and/or organisation listed
Wilton's Engineering Co ( Request for Special Survey of Boiler for Laura, 12th January 1915 1915 )
Holland Gulf Stoomvaart Maats ( Steel Steamer Report for Laura, 23rd March 1916 1916 )
Holland Gulf Stoomvaart Maatschappij ( Report on Machinery for Laura, 23rd March 1916 1916 )
Hook Steam Ship Co Ltd ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941 )
Hook Steamshipping Co Ltd ( Report of Total Loss, Casualty, &c for Aruba, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1159 ( Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Joseph de Poorter ( Steel Steamer Report for Laura, 23rd March 1916 1916 )
Goole & Hull Steam Towing Co Ltd ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Cargo Battens not Fitted; +LMC 3,16 ( Steel Steamer Report for Laura, 23rd March 1916 1916 )
+LMC 3 16 ( Report on Machinery for Laura, 23rd March 1916 1916 )
+100A1; Cargo batts Not Fitted; Deferred ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941 )
+100A1 10,41; S S No 3-4,29; S S No 2-37; +LMC MS 9,37; B S 1,41; TS 4,41Cl ( Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Laura, 23rd March 1916 1916 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1916 ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Wiltons Engineering & Slipway Co ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Rotterdam ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Screw Steamer ( Certificate of Survey for Laura, 15th March 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
The official record pronounced by the Committee
Torpedoed and Sunk ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Recorded date for the vessel’s loss or disposal.
20/11/1941 ( Plan of Cochran Patent Vertical Multitubular Boiler for Laura, 1913 1913, Note submitting that further action is unnecessary until boiler have been fitted on board Laura, 9th April 1915 1915, Request for Special Survey of Boiler for Laura, 12th January 1915 1915, Report on Boilers for Folmina, 26th March 1915 1915, Midship Section Plan for Aruba, 16th March 1915 1915, Longitudinal Plan for Aruba, 16th March 1915 1915, Plan of Crankshaft for Aruba, 19th March 1915 1915, Plan of Steel Boiler for Aruba, 19th March 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Aruba, 3rd April 1916 1916, Certificate of Survey for Laura, 15th March 1916 1916, Steel Steamer Report for Laura, 23rd March 1916 1916, Memo regarding donkey boiler safety valves for Laura, 3rd April 1916 1916, Letter to The Secretary, London, regarding Laura, 10th April 1916 1916, Copy of a Letter from Secretary, to The Surveyors, Rotterdam, regarding Laura, 4th April 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class & repairs to Aruba, 21st October 1941 1941, Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941, Report of Total Loss, Casualty, &c for Aruba, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report on Boilers for Folmina, 26th March 1915 1915 )
Rot ( Steel Steamer Report for Laura, 23rd March 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916 )
Hul ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941 )
The listed port to which a given vessel belongs.
Rotterdam ( Steel Steamer Report for Laura, 23rd March 1916 1916, Report on Machinery for Laura, 23rd March 1916 1916 )
Goole ( Report of Survey for Repairs, &c for Aruba, 3rd October 1941 1941 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Catlender ( Steel Steamer Report for Laura, 23rd March 1916 1916 )
W Cattender ( Report on Machinery for Laura, 23rd March 1916 1916 )
Name of surveyor.
F N Bernoski ( Report on Machinery for Laura, 23rd March 1916 1916 )
Location of construction for a vessel’s engines.
Rotterdam ( Report on Machinery for Laura, 23rd March 1916 1916, Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941 )
The port in which a vessel is registered or permanently based.
Goole ( Report of Survey for Repairs, &c, of Engines & Boilers for Aruba, 3rd October 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.