Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Ardandhu ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The process of transferring a vessel to water, but not necessarily her completion.
03/05/1893 ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Unique identifier for a given ship, it is assigned by a builder.
102 ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Location where a vessel’s survey was undertaken.
Belfast ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893 )
Glasgow ( Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
Ardrossan; Glasgow ( Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
A vessel’s means of propulsion.
undefined ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893 )
Steam ( Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Is the steamer assisted by sail?
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893 )
Gls ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Ardan S.S Co Ltd ( Steel Steamer Report for Ardandhu, 13th June 1893 1893 )
Clark & Service ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
Name of surveyor.
A Campbell Holms ( Steel Steamer Report for Ardandhu, 13th June 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893 )
A L Jones ( Report on Machinery for Ardanthu, 6th June 1893 1893 )
S A G Nash ( Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893 )
Henry Hand ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
The name of the port/place of destination given.
Jinidad Via Glasgow ( Steel Steamer Report for Ardandhu, 13th June 1893 1893 )
Mediterranean ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
Atlantic ( Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2091 ( Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Location of construction for a vessel’s engines.
The port in which a vessel is registered or permanently based.
Glasgow ( Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893 )
The year in which a vessel’s construction is completed.
1893 ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893 )
Screw Steamer ( Plan of Midship for Ardandhu, 6th July 1892 1892 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Does the vessel possess an auxiliary power source?
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Is electric lighting fitted to the vessel?
No ( Plan of Rudder Frame for Ardandhu, 1st September 1892 1892, Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Plan of Steel Boiler for Ardandhu, 25th May 1892 1892, Plan of Midship Arrangement of Beams & Deck Plating for Ardandhu, 26th November 1892 1892, Plan of Engine Space for Ardandhu, 26th November 1892 1892, Plan of Stern Frame for Ardandhu, 1st September 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Plan of Longitudinal Elevation for Ardandhu, 6th July 1892 1892, Plan of Midship for Ardandhu, 6th July 1892 1892, Plan of Donkey Boilers for Ardandhu, 1892 1892, Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Plan of Pumping Arrangement for Ardandhu, 21st March 1893 1893, Plan of Bilge & Ballast Arrangement for Ardandhu, 14th April 1893 1893, Plan of Bilge & Ballast Arrangements for Ardandhu, 9th March 1893 1893, Form From A Campbell Holms to The Secretary, Lloyd's Register, London, regarding the Tracing of Midship Section for the First Entry Certificate of Class for Ardandhu, 7th June 1893 1893, Letter From A Campbell Holms to W Jordan, regarding re-Moulded depth of the Vessel, Ardandhu, 20th June 1893 1893, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The listed port to which a given vessel belongs.
undefined ( Plan of Main Boilers for Ardandhu, 24th November 1892 1892, Form of Ship Forgings for Ardandhu, 28th October 1892 1892, Engine Forgings Form for Ardandhu, 7th November 1892 1892, Engine Forgings Form for Ardandhu, 15th September 1892 1892, Ship Castings Form for Ardandhu, 23rd March 1893 1893, Ship Castings form for Ardandhu, 30th March 1893 1893, Cover Note for 9 plans, for Ardandhu, 25th October 1893 1893 )
Glasgow ( Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893, Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893, Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
The individual and/or organisation listed
Clark & Service ( Steel Steamer Report for Ardandhu, 13th June 1893 1893, Report on Machinery for Ardanthu, 6th June 1893 1893 )
The Ardan Steam Ship Co Ltd ( Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893 )
Ardan Steam Ship Co Ltd ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
Ardan Steam Ship Co Ltd Clark & Service ( Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100 A1 Steel; Spam Dk; 1 Dk(SH) Spar Dk (SH- WS); Enquire(M) Deep Framing ( Steel Steamer Report for Ardandhu, 13th June 1893 1893 )
+LMC 6,93 ( Report on Machinery for Ardanthu, 6th June 1893 1893 )
100A1 Spar dk ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
+100A1 3-96 Spar Deck; +LMC 6-93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Ardandhu, 13th June 1893 1893 )
S - Ship ( Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Ardanthu, 6th June 1893 1893 )
Triple Expansion Direct Acting Inverted Surface Condensing Cylinder ( Vessel of 100 Tons & Upwards Report for Ardandhu, 12th June 1893 1893 )
Date in which construction of a vessel’s engines were completed.
Recorded information related to a vessel’s movements.
Glasgow; Mediterranean ( Report of Survey for Repairs, &c for Ardandhu, 1st June 1894 1894 )
Ardrossan; Atlantic ( Report of Survey for Repairs, &c, of Engines & Boilers for Ardandhu, 21st May 1897 1897 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.