Arabia ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/11/1897 ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

286 ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

undefined ( Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 Steel Spar dk; LA & CP; +LMC 3,98; 3Dks (U stl-Teak s) & Spar dk (Stl Teaks); FD Elec Light ( Steel Steamer Report for Arabia, 1st April 1898 1898 )

+LMC 3,98; FD Elec Light ( Report on Machinery for Arabia, 30th March 1898 1898 )

The name of the port/place of destination given.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1898 ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Half Midship Section Plan for Arabia, 25th March 1898 1898 )

1897 ( Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Caird & Co Ltd ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Half Midship Section Plan for Arabia, 25th March 1898 1898 )

Caird & Co ( Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Greenock ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Donkey Boiler for Arabia, 23rd October 1896 1896, Ship Forgings Form for Arabia, 31st October 1896 1896, Ship Forgings or Castings Form for Arabia, 9th December 1896 1896, Plan of Ballast & Bilge Pipes for Arabia, 5th November 1896 1896, Ship Forgings & Castings Form for Arabia, 23rd March 1897 1897, Confirmation of telegram regarding cables for Arabia, 18th December 1897 1897, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding weight of chain cables for Arabia, 23rd December 1897 1897, Note relating to Plan of Donkey Boiler for Arabia, 24th June 1897 1897, Letter from Russell & Co to Lloyds Surveyors, Greenock regarding damage caused by Arabia to Boveric, 1st March 1898 1898, Steel Steamer Report for Arabia, 1st April 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Report on Machinery for Arabia, 30th March 1898 1898, Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898, Letter from Thomas Phillips to the Secretary of Lloyds Register of Shipping, regarding electric lighting for Arabia, 11th April 1898 1898, Report on Electric Lighting Installation for Arabia, 30th March 1898 1898, Form from D Keith, Pro Surveyors to the Secretary, Lloyd's Register, London Forwarding Midship Section for Arabia, 30th March 1898 1898, Half Midship Section Plan for Arabia, 25th March 1898 1898, Memo from Chief Surveyor to the Classing Committee regarding class of Arabia, 4th April 1898 1898 )

Recorded information related to a vessel’s movements.

Voyage information

Greenock; East Indies ( Steel Steamer Report for Arabia, 1st April 1898 1898 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Direct acting Triple Expansion ( Report on Machinery for Arabia, 30th March 1898 1898 )

Triple Expansion Direct Acting ( Form for Vessels of 100 Tons & Upwards for Arabia, 12th March 1898 1898 )

Compound Engine Running at 190 rev Per Min ( Report on Electric Lighting Installation for Arabia, 30th March 1898 1898 )

The port in which a vessel is registered or permanently based.