Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Alps Maru ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
07/07/1917 ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
878 ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
The port in which a vessel is registered or permanently based.
Location where a vessel’s survey was undertaken.
Kobe ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921 )
Osaka; Kobe ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917 )
A vessel’s means of propulsion.
Steam ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
undefined ( Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921 )
Is the steamer assisted by sail?
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
1917 ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917 )
1918 ( Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918 )
1920 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
1921 ( Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921 )
0000 ( Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Kob ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
The individual and/or organisation listed
The Osaka Shosen Kabushiki Kaisha ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7790 ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
7789 ( Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917 )
Location of construction for a vessel’s engines.
The name of the port/place from which a vessel’s voyage originated.
San Francisco ( Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920 )
The name of the port/place of destination given.
Yokohama ( Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920 )
The year in which a vessel’s construction is completed.
1917 ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Osaka Iron Works Ltd ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Osaka ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Name of surveyor.
A L Jones ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918 )
Arthur L Jones ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Twin Screw Steamer ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Is electric lighting fitted to the vessel?
No ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920, Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921, Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
A vessel’s calculated maximum speed.
1917 ( Freeboard Verification Form for Steamers for Alps Maru, 10th November 1917 1917, Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917 )
1918 ( Letter from A L Jones, to The Secretary, London, regarding Alps Maru, 15th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alps Maru, 11th February 1918 1918 )
1920 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage & Condition of Alps Maru, 7th October 1920 1920, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920, Certificate of Survey for Alps Maru, 24th August 1920 1920, Certificate of Survey of Repairs for Alps Maru, 24th August 1920 1920, Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
1921 ( Memo to the Chief Ship Surveyor regarding Equipment for Alps Maru, 9th May 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 5th April 1921 1921, Memo to the Chief Ship Surveyor regarding Alps Maru, 22nd February 1921 1921, Letter from S Innes Preston, to The Secretary, London, regarding Alps Maru, 6th January 1921 1921 )
ated ( Plan of Structural Arrangement for Alps Maru, Undated no date, Half Midship Section Plan for Alps Maru, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
NMGB ( Steel Steamer Report for Alps Maru, 5th December 1917 1917 )
The listed port to which a given vessel belongs.
Osaka ( Steel Steamer Report for Alps Maru, 5th December 1917 1917, Report on Machinery for Alps Maru, 20th November 1917 1917, Report on Boilers for Alps Maru, 10th December 1917 1917, Report on Electric Lighting Installation for Alps Maru, 10th November 1917 1917, Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with Fbd; Cargo Battens Not Fitted in Shelter Tween Decks; +LMC 11,17; FD; Lloyd\'s A & CP ( Steel Steamer Report for Alps Maru, 5th December 1917 1917 )
+LMC 11,17; FD ( Report on Machinery for Alps Maru, 20th November 1917 1917 )
+100A1; Shelter Dk with fbd; Cargo Battens Not Fitted; in Shelter Tween Dk; +LMC 8,20 ( Report of Survey for Repairs, &c for Alps Maru, 28th August 1920 1920 )
+LMC 8,20 ( Report of Survey for Repairs, &c, of Engines & Boilers for Alps Maru, 30th August 1920 1920 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Alps Maru, 20th November 1917 1917 )
Date in which construction of a vessel’s engines were completed.
Recorded information related to a vessel’s movements.
San Francisco; Yokohama ( Certificate of Survey of Damage & Repairs for Alps Maru, 5th August 1920 1920 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.