Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

The process of transferring a vessel to water, but not necessarily her completion.

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle-upon-Tyne ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The listed port to which a given vessel belongs.

Port belonging to

Newcastle-upon-Tyne ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

A vessel’s means of propulsion.

Predominant material(s) utilised in a vessel’s construction.

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Types of timber used throughout a vessel’s construction

Timbering

EO - English Oak; FrO - French Oak; BO - Baltic Oak; AmO - American Oak ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Type of timbering specifically utilised for the vessel’s interior.

Inside planking

EO - English Oak; FrO - French Oak; O - Oak ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Is machinery fitted at the aft of the vessel?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The country in which the vessel’s construction took place, at the time of writing.

The country (flag) that a vessel is registered to, at the time of writing.

Country of registration

United Kingdom ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

The individual and/or organisation listed

Ship owner

Newcastle Union Shipping Co ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Location where a vessel’s survey was undertaken.

Location of Survey

St Lawrence, Newcastle-upon-Tyne; Newcastle ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Recorded information related to a vessel’s movements.

Voyage information

St Lawrence, Newcastle-upon-Tyne; Alexandria ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Physical arrangement of a ship’s masts, sails and rigging.

Type of fuel used onboard a vessel.

Is the steamer assisted by sail?

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Type of timbering specifically utilised for the vessel’s exterior.

Outside planking

EO - English Oak; FrO - French Oak; Bh - Beech; FO - Foreigner Oak/Foreign Oak; BO - Baltic Oak; PP - Pitch Pine; YP - Yellow Pine ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Report of survey for Agnes Sophia, 16 December 1839 1839 )

Does the vessel possess an auxiliary power source?

Is electric lighting fitted to the vessel?

Measurement from the extreme outboard point of starboard to the extreme outboard point of port.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.