Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
African Lady ( Midship Section Plan for African Lady, 25th November 1940 1940, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Ocean Strength ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943 )
Broompark ( Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948 )
The process of transferring a vessel to water, but not necessarily her completion.
14/06/1942 ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
12 ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Location where a vessel’s survey was undertaken.
New York ( Midship Section Plan for African Lady, 25th November 1940 1940 )
Schenectady N Y; New York ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941 )
South Portland Maine ( Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942 )
South Portland Maine; Portland Maine ( Steel Steamer Report for African Lady, 5th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942 )
Manchester ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
Cleveland ( American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942 )
So Portland Maine; Portland, Maine ( Report of Surveys for Freeboard for Ocean Strength, July 1942 1942 )
South Portland Maine; Portland, Maine ( Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942 )
South Shields Tyne ( Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947 )
Newcastle on Tyne ( Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948 )
London ( Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
London; Genoa ( Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
undefined ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948 )
Is the steamer assisted by sail?
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
The listed port to which a given vessel belongs.
London ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942 )
Greenock ( Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See N Yk RPT No 42712 ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941 )
+100A1 with freeboard; LMC (R) - 7,42 ( Steel Steamer Report for African Lady, 5th August 1942 1942 )
LMC (R) 7,42 ( Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942 )
3 S B (Spt) 220 lbs ( Report on Boilers for Ocean Strength, 2nd August 1942 1942 )
Elec Light ( Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942 )
+100A1 with Freeboard (contemplated) ( Report of Surveys for Freeboard for Ocean Strength, July 1942 1942 )
See Cco 3045 ( Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948 )
See Gms 22958 ( Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
Class withdrawn at Owners request ( Report of Ship Surveys & Repairs for African Lady, Undated no date )
Location of construction for a vessel’s engines.
Hamilton Ohio ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
The port in which a vessel is registered or permanently based.
London ( Steel Steamer Report for African Lady, 5th August 1942 1942 )
Manchester ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942 )
Greenock ( Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
William Lang Denholm ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
J & J Denholm Ltd ( Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
The year in which a vessel’s construction is completed.
1942 ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Todd Bath Iron Shipbuilding Corp ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
South Portland, Maine ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Screw Steamer ( Steel Steamer Report for African Lady, 5th August 1942 1942 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for African Lady, 25th November 1940 1940, Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Copy of Letter from Todd Bath Iron Shipbuilding Corporation, South Portland, Maine, to the Principal Surveyor, New York, regarding African Lady, 24th October 1942 1942, Memo to the Chief Ship Surveyor regarding First Entry for Ocean Strength, 14th September 1942 1942, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, American Bureau of Shipping Boiler & Machiner Test Certificate for Ocean Strength, 20th May 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Surveys for Freeboard - Conditions of Assignment for Ocean Strength, July 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 1st October 1942 1942, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Ocean Strength, 13th November 1943 1943, Report on Masts, Spars, & Rigging for Broompark, 22nd December 1947 1947, Copy of Certificate of Inspection for Broompark, 25th July 1947 1947, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Broompark, 21st April 1948 1948, Note for Broompark, 22nd April 1948 1948, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers for SS of Broompark, 8th April 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Broompark, 2nd March 1948 1948, Copy of Letter from Assistant Clerk to the Classification Committee, to the Surveyors, Genoa, regarding African Lady, 3rd June 1958 1958, Question & Answer Memo between London & Genoa Offices, regarding African Lady being Classed with another Classification Society, 6th May 1958 1958, Report of Ship Surveys & Repairs for African Lady, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
N.Yk ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941 )
P.Me ( Steel Steamer Report for African Lady, 5th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942 )
Nwc ( Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
Lon ( Report of Ship Surveys & Repairs for African Lady, Undated no date )
The individual and/or organisation listed
British Government ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Report on Boilers for Ocean Strength, 2nd August 1942 1942 )
H M Government in U K ( Steel Steamer Report for African Lady, 5th August 1942 1942 )
The Minister of War Transport ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
British Ministry of War Transport ( Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Surveys for Freeboard for Ocean Strength, July 1942 1942 )
Denholm Line Steamers Ltd ( Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7173 ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941, Steel Steamer Report for African Lady, 5th August 1942 1942, Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942, Report on Electrical Equipment for Ocean Strength, 2nd August 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Broompark, 2nd February 1948 1948 )
7152 ( Report of Surveys for Freeboard for Ocean Strength, July 1942 1942, Report of Survey for Repairs, &c for Broompark, 2nd February 1948 1948 )
7176 ( Report of Ship Surveys & Repairs for African Lady, Undated no date )
Date in which construction of a vessel’s engines were completed.
1941 ( Report on Boilers for Ocean Strength, 23rd May 1941 1941, Report on Boilers for Ocean Strength, 24th May 1941 1941, Report on Boilers for Ocean Strength, 26th May 1941 1941 )
1942 ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942, Report on Boilers for Ocean Strength, 2nd August 1942 1942 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
BDTW ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
Type and configuration of the engine(s) supplied for a vessel.
Direct Acting Surface Condensing Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Ocean Strength, 14th August 1942 1942 )
Triple Expansion ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Ocean Strength, 16th September 1942 1942, Report on Steam Reciprocating Engine Machinery for Ocean Strength, 1st August 1942 1942 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.