Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Adelaide ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
The process of transferring a vessel to water, but not necessarily her completion.
24/08/1883 ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Unique identifier for a given ship, it is assigned by a builder.
258 ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Location where a vessel’s survey was undertaken.
Partick Glasgow ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Glasgow ( Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
The listed port to which a given vessel belongs.
Adelaide ( Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Thomas Lockyer ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; La & Cp 2 Dk ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
+LMC 11,83 ( Report on Machinery for Adelaide, 6th November 1883 1883 )
The name of the port/place of destination given.
Adelaide ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1711 ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
1625 ( Report on Machinery for Adelaide, 6th November 1883 1883 )
Location of construction for a vessel’s engines.
Glasgow ( Report on Machinery for Adelaide, 6th November 1883 1883 )
The year in which a vessel’s construction is completed.
1883 ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D W Henderson & Co ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Adelaide, 29th September 1882 1882, Longitudinal Section Plan for Adelaide, 23rd December 1882 1882, Lower Deck Plan for Adelaide, 1882 1882, Iron Deck Plans for Adelaide, 2nd October 1882 1882, Awning Deck in way of Engines & Boilers Plan for Adelaide, 1882 1882, Plan of Section of Water Ballast Tank for Adelaide, 29th September 1882 1882, Plan of Sections Through Boiler Space for Adelaide, 23rd December 1882 1882, Longitudinal Section Plan for Adelaide, 29th September 1882 1882, Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883, Plan of Section Shewing Permanent Awning for Adelaide, 4th June 1883 1883, Plan of Boilers for Adelaide, 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 21st June 1883 1883, Plan of Elevation of Permanent Awning for Adelaide, 25th June 1883 1883, Openings in Awning Deck Plan for Adelaide, 14th July 1883 1883, Main Deck in Way of Engines & Boilers Plan for Adelaide, 23rd December 1883 1883, Piping Plan for Adelaide, 16th August 1883 1883, Plan of Steel Masts for Adelaide, 14th February 1883 1883 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883 )
The individual and/or organisation listed
Adelaide Steam Ship Co Ltd ( Iron Ship Report for Adelaide, 6th November 1883 1883, Report on Machinery for Adelaide, 6th November 1883 1883 )
Name of surveyor.
George Stanbury ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
John Sanderson ( Report on Machinery for Adelaide, 6th November 1883 1883 )
Recorded information related to a vessel’s movements.
Glasgow; Adelaide ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron Ship Report for Adelaide, 6th November 1883 1883 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Direct Acting ( Report on Machinery for Adelaide, 6th November 1883 1883 )
Date in which construction of a vessel’s engines were completed.
1883 ( Report on Machinery for Adelaide, 6th November 1883 1883 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.