Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/08/1934
The year in which a vessel’s construction is completed.
1897
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay Curle & Co
The name of the yard where the vessel was built.
Clydeholm
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4345
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Oslo 4113
The date of first visit by a surveyor.
17/07/1934
The individual and/or organisation listed
Nvalfanger A/S Africa
Name of the individual/entity/organisation responsible for authoring the record
Per Bjorn Roli
Location where a vessel’s survey was undertaken.
Sandefjord & Fredriksstad
The name of the port/place from which a vessel’s voyage originated.
Norway
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
3888
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
383.5
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
20
Name of ship as recorded on the record
Raglan Castle
The process of transferring a vessel to water, but not necessarily her completion.
20/01/1897
Unique identifier for a given ship, it is assigned by a builder.
408
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
09/08/1934
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
F Bettum
Location where the document is written.
Sandefjord & Fredriksstad
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
The name of the port/place of destination given.
United Kingdom
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4401
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
2570
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
46.3
Physical extent of a record.
3