Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/01/1922
The year in which a vessel’s construction is completed.
1898
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dundee Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dundee
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
109979
Additional numbers that feature on a given record that may be used for identification.
87830
The individual and/or organisation listed
Patrick Donovan
Location where the document is written.
Wexford
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
202
Type and configuration of the engine(s) supplied for a vessel.
Triple expansion engine, 3 cylinders
Cooper & Greig Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Foundered
Recorded date for the vessel’s loss or disposal.
05/01/1922
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
130.5
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
9.8
Name of ship as recorded on the record
Active
The process of transferring a vessel to water, but not necessarily her completion.
31/08/1898
Unique identifier for a given ship, it is assigned by a builder.
119
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Patrick Donovan
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
278
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
110
Location of construction for a vessel’s engines.
Dundee
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
56
Contextual information related to the reasons of the vessel’s loss or disposal.
She foundered in heavy weather two miles SW of Blackwater Light -vessels.
Recorded information relating the specific cargo being conveyed.
wheat
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
22.6
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.