10/08/1922
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow in Furness
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1971
The listed port to which a given vessel belongs.
Sydney, N.S.W.
The date of first visit by a surveyor.
16/12/1919
The individual and/or organisation listed
The Right Honourable William Morris Hughes PC MP Prime Minister of the Commonwealth of Australia
Location where the document is written.
Barrow in Furness
Location where a vessel’s survey was undertaken.
Barrow in Furness
Date of the meeting of the Classing Committee.
15/09/1922
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Parsons Impulse Reaction Turbines with Double Reduction Helical Gearing
Date in which construction of a vessel’s engines were completed.
1922
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by a Raider
Vessel’s area of loss or disposal/last known recorded location.
Atlantic
Physical extent of a record.
1
Name of ship as recorded on the record
Jervis Bay
The process of transferring a vessel to water, but not necessarily her completion.
17/01/1922
Unique identifier for a given ship, it is assigned by a builder.
575
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brw
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4a Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
04/09/1922
Name of the individual/entity/organisation responsible for authoring the record
John Houston
Name of surveyor.
John Houston
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,22 FD, CL; Fitted for oil fuel 9,22 FP above 150°F
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
13839
Location of construction for a vessel’s engines.
Barrow in Furness
Vickers Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1
Recorded date for the vessel’s loss or disposal.
05/11/1940
Pertinent, useful or interesting recorded content.
Also refers to vessels Moreton Bay & Hobsons Bay