Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/01/1912
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong Whitworth & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker, Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
12401
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 60354
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
16/01/1912
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W Lowden & Co
Name of the individual/entity/organisation responsible for authoring the record
Henry C T Ireland
Location where a vessel’s survey was undertaken.
Barry
Date of the meeting of the Classing Committee.
23/01/1912
The name of the port/place of destination given.
Rio de Janeiro
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4937
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Helvetia
The process of transferring a vessel to water, but not necessarily her completion.
28/03/1211
Unique identifier for a given ship, it is assigned by a builder.
829
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bry
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
Liverpool
The date of first visit by a surveyor.
13/01/1912
The individual and/or organisation listed
W Lowden & Co
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Connell
Location where the document is written.
Barry
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
Recorded information related to a vessel’s movements.
Barry; Rio de Janeiro
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.