Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/12/1919
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cameron Genoa Mills Shipbuilders Ltd
The country in which the vessel’s construction took place, at the time of writing.
Canada
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
72644
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Antwerp 11053
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
23/12/1919
Name of the individual/entity/organisation responsible for authoring the record
W L Hall
Name of surveyor.
W L Hall
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS 9,19
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Montreal
Dominion Bridge Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sank in the Bay of Biscay owing to damage received during a hurricane between 31 December 1919 and 4 January 1920. Steering gear malfunctioned and a leak extinguished the fire in the boilers. All crew were picked up and safely brought to Dover
Physical extent of a record.
1
Name of ship as recorded on the record
Nipponier
The process of transferring a vessel to water, but not necessarily her completion.
12/06/1918
The port or place in which the vessel’s construction took place, at the time of writing.
Victoria British Columbia
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
The port in which a vessel is registered or permanently based.
Antwerp
The date of first visit by a surveyor.
23/12/1919
The individual and/or organisation listed
Lloyd Royal Belge Societe Anonyme
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
South Shields
Date of the meeting of the Classing Committee.
20/01/1920
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2342
Date in which construction of a vessel’s engines were completed.
1918
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Foundered
Recorded date for the vessel’s loss or disposal.
06/01/1920
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.