Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/08/1917
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Beardmore & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dalmuir
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5721
The listed port to which a given vessel belongs.
Liverpool
The date of first visit by a surveyor.
12/08/1917
The individual and/or organisation listed
Pacific Steam Navigation Co
Name of the individual/entity/organisation responsible for authoring the record
Frank Davis
Location where a vessel’s survey was undertaken.
Falmouth
Date of the meeting of the Classing Committee.
26/11/1918
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4612
Date in which construction of a vessel’s engines were completed.
1907
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by submarine
Vessel’s area of loss or disposal/last known recorded location.
South coast of Ireland
Physical extent of a record.
1
Name of ship as recorded on the record
Junin
The process of transferring a vessel to water, but not necessarily her completion.
22/08/1907
Unique identifier for a given ship, it is assigned by a builder.
491
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Fal
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
20/08/1917
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Barkley
Location where the document is written.
Falmouth
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
W Beardmore & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
4
Recorded date for the vessel’s loss or disposal.
10/07/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.