Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

30/05/1904

The year in which a vessel’s construction is completed.

Year of ship completion

1903

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Readhead & Sons

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

3118

The listed port to which a given vessel belongs.

Port belonging to

Trieste

The date of first visit by a surveyor.

Date of first survey

27/04/1904

The individual and/or organisation listed

Ship owner

Gerty Steam Ship Co Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

Maurice Ritson

Name of surveyor.

Surveyor

Maurice Ritson

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; spar dk 6,03; +LMC 6,03

Recorded information related to a vessel’s movements.

Voyage information

Genoa; Trieste

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

South Shields

Engine builder as written

J Readhead & Sons

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up Purposes

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Gerty

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

27/04/1903

Unique identifier for a given ship, it is assigned by a builder.

Yard no

369

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Gen

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

26/05/1904

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Zar

Location where the document is written.

Location of Document Creation

Genoa

Location where a vessel’s survey was undertaken.

Location of Survey

Genoa

Date of the meeting of the Classing Committee.

Date of Classing committee

07/06/1904

The name of the port/place of destination given.

Destined voyage

Trieste

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

4027

Date in which construction of a vessel’s engines were completed.

Year of engine build

1903

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.