Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/10/1922
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
H M Dockyard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sws
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Fittings
The date of first visit by a surveyor.
20/07/1922
The individual and/or organisation listed
The Admiralty
Location where the document is written.
Swansea
Date of the meeting of the Classing Committee.
17/11/1922
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Lost by war risk
Physical extent of a record.
1
Name of ship as recorded on the record
Oleander
The process of transferring a vessel to water, but not necessarily her completion.
26/04/1922
The port or place in which the vessel’s construction took place, at the time of writing.
Pembroke Dock
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15952
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
19/09/1922
Name of the individual/entity/organisation responsible for authoring the record
H Gilby
Location where a vessel’s survey was undertaken.
Pembroke Dock
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
War Loss
Recorded date for the vessel’s loss or disposal.
__/06/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.