Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/08/1901
The year in which a vessel’s construction is completed.
1901
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Russell & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13109
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
27/09/1900
The individual and/or organisation listed
Anglo American Oil Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
A C Heron; R Elliott
Name of surveyor.
R Elliott
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 8,01
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4848
Location of construction for a vessel’s engines.
Greenock
Rankin & Blackmore
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to shipbreakers for Demolition & Commenced
The country or national waters where a vessel is lost/disposed of, or last recorded.
Japan
Physical extent of a record.
1
Name of ship as recorded on the record
Seneca
The process of transferring a vessel to water, but not necessarily her completion.
19/07/1901
Unique identifier for a given ship, it is assigned by a builder.
477
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
16/08/1901
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Cormack
Location where the document is written.
Greenock
Location where a vessel’s survey was undertaken.
Port Glasgow
Date of the meeting of the Classing Committee.
26/08/1901
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Inverted Direct acting Triple Expansion
Date in which construction of a vessel’s engines were completed.
1901
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Osaka
Recorded date for the vessel’s loss or disposal.
__/__/0000
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.