Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/08/1924
The year in which a vessel’s construction is completed.
1924
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Duthie Torry Shipbuilding Co
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 1009, 1010 JES
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
21/07/1924
Location where the document is written.
Dundee
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
A Hall & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Nothing has been heard of
Recorded date for the vessel’s loss or disposal.
24/06/1933
Pertinent, useful or interesting recorded content.
Engine Forgings No 2876; Manufactured by J Carmichael & Co Ltd of Dundee
Name of ship as recorded on the record
Christina Fraser
The process of transferring a vessel to water, but not necessarily her completion.
16/10/1924
Unique identifier for a given ship, it is assigned by a builder.
465
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Aberdeen 13897
The date of first visit by a surveyor.
24/07/1924
Name of the individual/entity/organisation responsible for authoring the record
J E Sellex
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Aberdeen
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Missing
19
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.